Similar Projects
Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement
Term Contract
Design
Hill AFB, UT

600/640 West Street and Culinary Water Reconstruction Project
Infrastructure
Bidding
West Bountiful, UT

Veterans Park Utility Improvement Project
Infrastructure
Bidding
$159,380 est. value
Sunset, UT

Construction of the 1200 South Road Project
Post-Bid
Syracuse, UT

Construction of the 400 East (Chase Lane to Parrish Lane) - Street Rebuild
Post-Bid
$450,000 est. value
Centerville, UT

37th Street Reconstruction Project and Culinary Waterline Replacement CDBG Project
Results
South Weber, UT 84403

Moenave Trail Improvements
Results

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Eagleridge Drive Street Overlay Edgewood Drive to Vista View Lane
Infrastructure
Bidding
North Salt Lake, UT 84054

1970 South 1200 West Street Construction Project
Post-Bid
$1,100,000 est. value
Woods Cross, UT 84087

Eagleridge Drive Street Overlay Vista View Lane to Eaglewood Loop
Results
$100,000 to $150,000 est. value
North Salt Lake, UT

Crack and Slurry Seal Project 2021
Post-Bid
$275,000 est. value
Centerville, UT

2000 West and 1300 North Intersection Clinton
Results
$500,000 to $1,500,000 est. value
UT

Street Overlay Project 2021
Post-Bid
$250,000 est. value
Centerville, UT

2021 Road Reconstruction Project
Results
West Bountiful, UT

Reported 02/23/2022 12:00 AM
Project Title

2022 Road Improvement Project

Physical Address View project details and contacts
City, State (County) Syracuse, UT   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installation of approximately 32 ADA ramps and 373,300 SF of Asphalt.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents