Similar Projects
Nall Avenue Lane Reduction 4 Lanes to 3 Lanes - TH-1915 - City of Overland Park
Infrastructure
Conception
$465,000 CJ est. value
Leawood, KS 66209

87th Street Parkway Improvements - Renner Boulevard to Maurer Road - 60108 - City of Lenexa
Infrastructure
Conception
$8,400,000 CJ est. value
Lenexa, KS 66215

City of Lawrence Field Operations Campus
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Lawrence, KS 66044

US-166/ US-400: Reconstruct Interchange and 4 Lanes
Infrastructure, Renovation
Design
$49,611,744 CJ est. value
Baxter Spgs, KS 66713

2023 Chip Seal Program, Part 2
Infrastructure
Bidding
$500,000 CJ est. value
Overland Park, KS 66204

Cheney Reservoir Access
Infrastructure
Bidding
$5,000,000 CJ est. value
Kingman, KS 67068

2022 Crack Seal
Infrastructure
Post-Bid
$60,000 CJ est. value
Louisburg, KS 66053

CDBG Street System Improvements
Infrastructure
Post-Bid
$900,000 CJ est. value
Highland, KS 66035

FY2021 KDOT Cost Share Sidewalk Improvements
Infrastructure
Results
$248,447 CJ est. value
Ellsworth, KS 67439

2022 Pavement Management Program, Crack Seal and Mirco-Surfacing
Infrastructure
Results
$777,488 CJ est. value
Leavenworth, KS 66048

2022 Asphalt Streets Resurfacing Project
Infrastructure
Construction
$217,989 CJ est. value
Osawatomie, KS 66064

Highway 81 - City of Concordia
Infrastructure
Pending Verification
$899,157 CJ est. value
Concordia, KS 66901

RFQ Engineering - 83rd Street Bridge Replacement
Infrastructure
Pending Verification
$2,000,000 CJ est. value
De Soto, KS 66018

Reconstruction of the I-135/36th Street Interchange
Infrastructure
Conception
$15,074,608 CJ est. value
Newton, KS 67114

Quivira Road: 183rd Street to 187th Street - TH-1147 - City of Overland Park
Infrastructure
Design
$2,940,000 CJ est. value
Overland Park, KS 66013

Last Updated 01/05/2023 01:33 AM
Project Title

RFP - Regional Capital Imrpovment Plan (CIP) Prioritzation

Physical Address View project details and contacts
City, State (County) Leavenworth, KS 66048   (Leavenworth County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Leavenworth County Port Authority (LCPA), in cooperation with Leavenworth County, the City Leavenworth, the City of Basehor, the City of Lansing, the City of Tonganoxie, the Kansas Department of Transportation (KDOT), and the Mid-America Regional Council (MARC) is seeking a KDOT pre-qualified consultant for Long Range Planning to help prioritize potential capital improvement projects assembled from a list of previously completed studies as well as some potential new projects. Over the past several years, various studies have been completed by various entities. It is the desire of the stakeholders within the Leavenworth County Region to review the associated recommended projects and to develop a prioritization, based on community input, feasibility, connectivity to the greater Kansas City metropolitan area, and technical criteria, to focus limited resources. A partial list of these projects include: 2014 5-County Study (KC Metro + Douglas County) 2000 Kaw Connect Major Corridor Study (I-70: Topeka to Kansas County) 2006 K-7 Corridor Management Plan 2007 US-24 / 40 Corridor Management Plan 2008 T-Link & KDOT Consultation: Leavenworth County Transportation Priorities) 2016 K-92 Centennial Bridge Study Patriot Highway (PPP Agreement) Leavenworth County, city stakeholders, and surrounding county Comprehensive Plans 2020 Eastern Gateway Concept Study Please contact Leavenworth County Public Works, Bill Noll, with questions via email only at bnoll@leavenworthcounty.gov. Only written questions will be responded to and must be received by November 30, 2021. Responses to questions will be provided by close of business on December 2, 2021. The method of contractor selection has not been determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents