Similar Projects
HVAC Installation
Bidding
Franklinville, NC 27248

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Dabney Hall HVAC Evaluation and Upgrade Phase 2
Renovation - 139,000 SF
Results
Less than $2,700,000 est. value
Raleigh, NC

Indian Trail Elementary School HVAC Renovations
Results
Indian Trail, NC

WRRC Building - Partial HVAC Replacement
Post-Bid
Charlotte, NC 28204

Air Handling Units 59 and 60
Results
Charlotte, NC

Workplace West III and V HVAC and Fire Alarm
Post-Bid
Winston-Salem, NC

AHU, VAV/DDVAV and Controls Upgrade - Phase 1 Dowdy Administration Building
Results
Greensboro, NC 27400

Chiller Replacement Project at Bethesda Elementary School
Post-Bid
Durham, NC 27703

H--Testing, Adjusting And Balancing Of Air And Water Distribution Systems
Results
Durham, NC 27705

Mult-Stop AC Units
Post-Bid
Goldsboro, NC 27531

HVAC Renovations Price Music Hall
Results
Raleigh, NC

Ada Jenkins Center HVAC Renovations
Post-Bid
Davidson, NC 28036

Wake County Agricultural Services Building HVAC Renovation
Results
$1,000,000 to $1,500,000 est. value
Raleigh, NC 27600

Reported 01/16/2019 12:00 AM
Project Title

Replacement LRC Rooftop Package Unit on 100 Building and Replacement of Rooftop Package Units on 400 Building

Physical Address View project details and contacts
City, State (County) Weldon, NC   (Halifax County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replace one (1) roof-top package unit in its entirety on top of the LRC Section of the 100 Building along with the eleven (11) roof-top package units in their entirety on top of the 400 Building. Agreement is to include the removal of the one (1) roof-top package unit on the top of the LRC section of the 100 Building along with the eleven (11) existing roof-top package units from the top of the 400 Building, replace all gas piping and regulators, along with all shut-off valves, reconnect all gas piping, all electrical disconnects and related wiring and connections to include the weather tight conduit to the roof curb penetrations, and replace all sheet metal duct hoods. The size of the roof-top package units on the 400 Building are two (2) four (4) ton units, three (3) five (5) ton units, four (4) seven and a half (7.5) ton units, and two (2) ten (10) ton units. The size of the roof-top package unit on the 100 Building is one (1) ten (10) ton new roof-top package unit for the LRC section of that building. Replace all existing thermostats with new programmable thermostats with built in building automation capabilities to match existing systems.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents