Similar Projects
E Sunset Way Vic and NB Lowell Rd Vic PCCP Exp Jnt Rehab & Deck Overlay
Renovation, Infrastructure
Bidding
$12,500,000 est. value
Issaquah, WA

SR 96, North Creek Fish Passage
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
Mill Creek, WA 98082

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

2022 Street Overlay and ADA Ramps
Infrastructure
Post-Bid
$360,000 to $440,000 est. value
Stanwood, WA 98292

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Madison Combined Sewer Separation
Infrastructure
Bidding
$3,200,000 est. value
Monroe, WA

Airport Parking Lot Access Modification
Term Contract
Post-Bid
WA

172nd Street NE & 40th Avenue Signal and Median Improvements
Infrastructure, Alteration
Results
$1,846,000 est. value
Arlington, WA 98223

2022 Annual Road Maintenance
Term Contract
Bidding
$425,000 est. value
Monroe, WA

HASCO Properties - Asphalt Sealcoat, Stripe, and Miscellaneous Repairs
Infrastructure
Post-Bid
$3,000,000 est. value
Everett, Lake Stevens, Lynnwood, Marysville, Mountlake Terrace, Snohomish, WA 98043

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

2022 Utility and Pavement Preservation Project
Infrastructure
Bidding
$300,000 est. value
Arlington, WA 98223

Highway 99 Revitalization & Gateway Project - Stage 2 and 76Th Ave Overlay Project
Term Contract, Alteration
Post-Bid
Edmonds, WA

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Last Updated 06/07/2022 06:31 AM
Project Title

SR 9, SR 204 Intersection Improvements (Stage 3)

Physical Address View project details and contacts
City, State (County) Lake Stevens, WA 98258   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DVBE(5%) Adding two multi-lane roundabouts on SR 9, two single lane roundabouts at adjacent intersections, grading, paving with hot mix asphalt (HMA), pigmented Portland cement concrete pavement (PCCP) installation, drainage, planting, illumination, intelligent transportation system (ITS), American Disabilities Act (ADA) features, traffic control and other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents