Similar Projects
Nutrient Reduction Modifications - Phase 2 - City of Ames
New Construction
Conception
$14,260,000 est. value
Ames, IA 50010

Final Clarifier Rehabilitation - 710-2598 - City Of Dubuque
Renovation
Conception
$1,350,000 est. value
Dubuque, IA

2021/22 Water Plant Facility Improvements - Split Treatment - City of Ames
Renovation
Design
$200,000 CJ est. value
Ames, IA 50010

Headworks and Digester Improvements
Renovation, Infrastructure
Bidding
$9,910,000 CJ est. value
Marshalltown, IA 50158

RFQ Design - Engineering Services Heat System for Water Pollution Control Plant (WPCP) Digester
Renovation
Bidding
$300,000 CJ est. value
Davenport, IA 52802

Water Treatment Plant Aerator Replacement
Renovation
Sub-Bidding
$180,000 CJ est. value
Hamburg, IA 51640

Water Pollution Control Facility Operations Roof Replacement
Renovation
Sub-Bidding
$175,000 CJ est. value
Ottumwa, IA 52501

Slater WWTP Improvements
Renovation
Post-Bid
Less than $6,000,000 est. value
Slater, IA

Proposed Wastewater Improvements
Renovation
Post-Bid
$987,000 est. value
Columbus Junction, IA

WWTF Improvements UV Disinfection
Renovation
Results
Walford, IA

WRF Primary Sludge Piping Replacement - 2021
Renovation
Results
Less than $1,275,000 est. value
Des Moines, IA 50317

Reverse Osmosis Wastewater Treatment Plant - City Of Le Mars
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Le Mars, IA 51031

Water Quality Improvement Project - City of Clarinda
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Clarinda, IA 51632

Cryo Plant Improvements - 6150058 - City Of Cedar Rapids
Renovation
Conception
$3,000,000 est. value
Cedar Rapids, IA 52401

Wastewater Treatment Facility - Sludge Disposal
Term Contract
Bidding
$500,000 CJ est. value
Eddyville, IA 52553

Last Updated 08/09/2022 09:32 AM
Project Title

Wastewater Reclamation Facility Digester Repairs and Improvements

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50317   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,280,350 [brand] Estimate
Plans Available from Municipal Agency - 06/21/22
Owner View project details and contacts
Architect View project details and contacts
Description

Accessibility for individuals with disabilities. The City of Des Moines is pleased to provide accommodations to individuals with disabilities or groups and encourages participation in City government. To better serve you, please notify us at least three business days in advance when possible at 515-283-4209, should special accommodations be required. Time for Commencement and Completion of Work. Work on each improvement shall be commenced upon approval of the contract by the WRA Board, and completed as stated below. Bid Security. Each bidder shall accompany its bid with bid security as defined in Section 26.8 of the Iowa Code and as specified by the Jurisdiction. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in the bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. The improvement includes hydro-demolition and replacement of a portion of the concrete lid for anaerobic digester No. 3, pre-cast concrete panel and joint repairs and cleaning to the exterior of anaerobic digesters No. 1-6, concrete crack repairs to the lid of anaerobic digesters No. 2-6, installation of new water level sensors and associated work for anaerobic digesters No. 2-6, and all other associated work and incidental items; all in accordance with the contract documents, including Plan File No. 643-115/127, located at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa This project shall be fully completed not later than July 31, 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents