Similar Projects
1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Pavement Rehabilitation
Infrastructure
Post-Bid
Hoffman Estates, IL

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2022 Sidewalk and Concrete Maintenance
Results
Palatine, IL 60067

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Auburn Park Station & Parking Facility
New Construction, Alteration - 4,678 SF
Construction
Chicago, IL 60620

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

Halsted Street Mixed-Use Development
New Construction, Infrastructure - 4,000 SF
Pending Verification
$2,000,000 CJ est. value
Chicago, IL 60614

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

153rd Street Resurfacing
Alteration
Post-Bid
Chicago, IL

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

Last Updated 03/20/2023 12:36 AM
Project Title

2022 Roadway Improvements Project

Physical Address View project details and contacts
City, State (County) Maywood, IL 60153   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,752,498 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

the President and Board of Trustees of the Village of Maywood, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: 2022 ROADWAY IMPROVEMENTS PROJECT This project consists of roadway, sewer, and water main improvements at various locations within the Village of Maywood. The work to be performed will include the installation of approximately 480 feet of 8" ductile iron water main and appurtenances; connection of water mains and installation of water services; sewer televising and sewer lining of approximately 600 feet of combined sewer using the inversion method; replacement or repair of defective drainage structures; replacement of deteriorated storm sewer laterals and certain sections of combined sewer; removal and replacement of curb and gutter, sidewalks, and driveway pavement; excavation of the existing pavement; installation of an aggregate base course; installation of concrete alley pavement; reconstruction of pavements with hot-mix asphalt binder and hot-mix asphalt surface courses; milling and resurfacing of hot-mix asphalt pavements; pavement markings and signage; landscaping restoration of the parkways, and other related work. The Engineer has been authorized to refuse to issue plans, specifications, and proposals to any person, firm, or corporation that he considers to be unqualified. Proposals must be submitted on the forms provided. All bidders wishing to obtain bidding documents must be approved by the Village prior to obtaining bidding documents. All bidders must provide proof that they are prequalified with the Illinois Department of Transportation to perform at least 50% of the value of the work before being issued bidding documents. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Maywood for a period forty-five (45) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. Bidders shall adhere to certain Disadvantaged Business Enterprise (DBE) bid submittal requirements and observe the stated DBE goals as described within the contract documents. The successful bidder for the work will be required to furnish sufficient insurance to the Village of Maywood and the Engineer against all damage claims that might arise due to the negligence of the Contractor and will be required to furnish a Performance Bond and a Labor and Material Payment Bond in the amount of the contract. The Village of Maywood reserves the right in receiving these bids to waive technicalities and reject any or all bids. This project will consist of improvements to the following sections of street: Roadway Limits Wilcox Street 21 st Avenue to 19 th Avenue 8th Avenue Green Street to Madison Street8 th Avenue Madison Street to School Street School Street 3rd Avenue to 1st Avenue 3rd Avenue Madison Street to School Street 2nd Avenue South Terminus to School Street Erie Street 3rd Avenue to 2 nd Avenue The work to be performed will include the installation of approximately 480 feet of 8" ductile iron water main and appurtenances; connection of water mains and installation of water services; sewer televising and sewer lining of approximately 600 feet of combined sewer using the inversion method; replacement or repair of defective drainage structures; replacement of deteriorated storm sewer laterals and certain sections of combined sewer; removal and replacement of curb and gutter, sidewalks, and driveway pavement; excavation of the existing pavement; installation of an aggregate base course; installation of concrete alley pavement; reconstruction of pavements with hot-mix asphalt binder and hot-mix asphalt surface courses; milling and resurfacing of hot-mix asphalt pavements; pavement markings and signage; landscaping restoration of the parkways; and other related work

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents