Similar Projects
Matanuska Susitna Borough Heating Conversion at Fire Station
Alteration
Results
Willow, AK 99688

Kodiak Fisheries Research Center Fume Exhaust Upgrades
Alteration
Results
Kodiak, AK 99615

Campus Wide Lathrop and Lola Tilly Cooling project
Alteration
Results
$500,000 to $1,000,000 est. value
Fairbanks, AK

Kenai Recreation Center Improvements Project
Alteration
Post-Bid
Kenai, AK 99611

King Tech High School Welding Shop Ventilation Upgrades
Alteration
Results
$500,000 to $1,000,000 est. value
Anchorage, AK 99517

Wrangell Compound HVAC Replacement Phase 2
Infrastructure
Design
$500,000 to $1,000,000 est. value
Wrangell, AK

Oil Burner Relocation
Term Contract
Post-Bid
Less than $5,000 est. value
Sitka, AK 99835

Maintain Boiler 4
Term Contract
Design
$5,000,000 to $10,000,000 est. value
AK

Reported 03/16/2022 12:00 AM
Project Title

Install Vent Hood

Physical Address View project details and contacts
City, State (County) Anchorage, AK 99506   (Anchorage County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of work to install a ventilation hood and duct system in vicinity of Sonic Parts Washer located in Room 209 of Building 16718, JBER. New ducting will tie into the existing 24" duct on the adjacent paint booth ventilation system. Please see Attachment 1 for further details. : Project consists of work to install a ventilation hood on the Sonic Parts Washer in Room 209 of Building 16718, refer to drawings provided. This project shall be accomplished as an Open Market Project. The Contractor shall provide shop drawings (mechanical, electrical) for review prior to beginning work. Prior to the closeout of the project, the contractor shall provide Operations Training on all new equipment installed as part of this project. In addition, the contractor shall ensure that equipment installed DOES NOT have Bluetooth or Wireless capabilities. There is NO asbestos containing material (ACM) or Lead based paint (LBP) in the associated work areas.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents