Similar Projects
External Tank Inspection - Air Force Academy Colorado
Bidding
CO

Magnesium Chloride Tanks - Kersey & Greeley
Bidding
CO

12K Tanks
Post-Bid
CO

21 K Fiber Glass Tanks
Post-Bid
CO

Put Hill Finish Water Storage Tank
Results
Pagosa Springs, CO

Miscellaneous Pipe Coating and Tank Repair 2019
Results
Less than $150,000 est. value
Loveland, CO

CTF CDOC Fuel Tank Repairs BP1 DQ1 CMS163766
Bidding
$100,000 est. value
Denver, CO

Stock Water Pipeline and Bottomless Tanks
Post-Bid
Sterling, CO 80751

3rd Party Natural Gas Services
Results
Grand Junction, CO

Central Platte Campus CNG Feuling Complex Maintenance and Repair Services
Term Contract
Post-Bid
Denver, CO 80223

Aspen Maintenance Facility Phase 9 Fuel Tank Replacement
Results
Aspen, CO 81611

Cde Ten Well Plugging Project
Post-Bid
Denver, CO

Fuel Island Expansion for LPG Autogas
Results
Thornton, CO 80240

Romo Temporary Fuel Tank Hookup
Post-Bid
Estes Park, CO 80517

Livermore Fuel Site Tank Relocation
Results
$100,000 to $150,000 est. value
Livermore, CO 80521

Last Updated 02/28/2020 10:26 AM
Project Title

Catamount Ranch Water Tank Improvement

Physical Address View project details and contacts
City, State (County) Steamboat Springs, CO   (Routt County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes interior and exterior painting and improvements to the existing 250,000-gallon above ground steel Catamount Ranch Water Tank with anticipated construction in the Fall of 2020, followed by interior and exterior painting and improvements to the existing 250,000-gallon above ground steel Catamount Lake Water Tank with anticipated construction in the Fall of 2021 (with separate bid schedules for the work corresponding to each tank). Improvements for each tank will include replacement of the existing access hatch and addition of a second access hatch, replacement of the existing tank vent, and coordination of temporary water storage through an Owner-supplied 40,000-gallon storage tank while the 250,000-gallon tanks are out of service during the approximately one-month planned painting work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents