Similar Projects
SLC Airport PCC Pavement Joint Seal Program - Deicing Pad Taxiway
Post-Bid
Salt Lake City, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

2021 High Density Mineral Bond
Results
South Jordan, UT 84095

On-Call Transit Infrastructure Construction, Maintenance and Repair
Term Contract
Results
Less than $5,000,000 est. value
Salt Lake City, UT

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Deer Ridge Drive Reconstruction
Alteration
Post-Bid
$980,000 est. value
Draper, UT

2020 West Jordan Ada Pedestrian Ramp Project
Results
$259,428 est. value
West Jordan, UT

City-Wide Roadway Improvement Project
Infrastructure
Post-Bid
Cottonwood Heights, UT

3900 South 700 East to Jordan River Overlay
Results
Salt Lake City, UT

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Design Roadway Improvements
Results
Salt Lake City, UT

UDOT Asphalt Pavement Repair US189 MP 26.7 WB
Term Contract, Infrastructure
Post-Bid
Salt Lake City, UT

Asphalt Paving Repair Services
Results
Salt Lake City, UT

CCA Riverton Access Drive
Demolition, Alteration
Post-Bid
Riverton, UT 84096

Local Strees Reconstruction 2021 #1
Results
Less than $2,383,000 est. value
Salt Lake City, UT

Last Updated 07/07/2022 06:39 AM
Project Title

I-15 NB On-Ramp at SR-173 Choke Point

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84123   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Location: I-15 NB On-Ramp at SR-173 The principal items of work are as follows (for all items of work see attachment): Portland Cement Concrete Pavement 9 inch Thick Cast-In-Place Concrete Constant Slope Half Barrier 42 Inch Traffic Control

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents