Similar Projects
Go-Kart Facility
New Construction - 50,000 SF
Conception
Tallahassee, FL 32308

Jai Alai and Card Room
New Construction - 100,000 SF
Design
Miami, FL

Live! Resorts Pompano - Master Plan
New Construction - 2,482,473 SF
Design
$10,000,000 CJ est. value
Pompano Beach, FL 33069

Yellow Fever Creek Preserve Park
New Construction - 4,068 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Cape Coral, FL 33909

2020 Frances Avenue Park Shelter Improvements
New Construction
Bidding
New Port Richey, FL 34653

Renovation and Expansion of the REC
Renovation
Sub-Bidding
Less than $3,000,000 est. value
Port Orange, FL 32129

Lake Concord Park - Art House Expansion
Addition
Sub-Bidding
Casselberry, FL 32707

Ellie Schiller Homosassa Springs Wildlife State Park - Ranger Residence Replacement
Post-Bid
Homosassa, FL 34446

Installation of Shade Structures
Post-Bid
Weston, FL

Design, Engineer, and Install Fuel Canopy for the PWC Complex
Results
Less than $143,779 est. value
Sanford, FL 32771

Shade Structure Design and Install
Term Contract
Results
Less than $320,000 est. value
Largo, FL 33779

Ibis Golf and Country Club
New Construction, Addition - 25,252 SF
Construction
$5,600,000 est. value
West Palm Beach, FL 33412

Rosemont Community Center
New Construction - 15,854 SF
Construction
Orlando, FL 32808

Harbormaster Building Replacement
New Construction, Renovation
Pending Verification
$400,000 est. value
Dunedin, FL 34698

Hospital Area Pool
Renovation, Addition
Pending Verification
$300,000 est. value
Apopka, FL

Last Updated 01/27/2022 10:29 AM
Project Title

Wekiwa Springs State Park - Dining Hall Improvements

Physical Address View project details and contacts
City, State (County) Apopka, FL 32712   (Orange County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all labor materials equipment, supervision, and permitting to safely disconnect existing plumbing and electrical connections. Remove and safely dispose damaged wood studs, partitions between existing kitchen and staff restrooms. Provide a continuous concrete curb as a base for a new continuous fire-rated partition between kitchen and staff restroom as shown on drawings. Build a new unisex staff restroom with complete new fixtures and accessories including ceramic tile flooring, walls and painting.

Details

Misc. Recreational, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents