Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Replace T2a Transformer
Post-Bid
Colorado Springs, CO 80914

Emergency Generator
Post-Bid
Colorado Springs, CO

Transformer Alliance: Single and Three Phase Padmount, Overhead and Submersible
Term Contract
Results
Colorado Springs, CO 80947

UPS Battery Replacement and Installation
Results
Fort Carson, CO 80913

Weatherization Materials - Energy Resource Center
Term Contract, Alteration
Construction
Colorado Springs, CO 80903

Airport Carport Solar Project
Post-Bid
Colorado Springs, CO 80947

Nixon ZD Switchgear
Results
Fountain, CO 80817

Chestnut Security Lighting Upgrade
Alteration
Post-Bid
$215,000 est. value
Colorado Springs, CO 80907

Transformer (750KVA) Pad Mount Replacement and Installation
Results
Colorado Springs, CO 80914

Peterson AFB Cat-6 Premise Wiring/Inside Plant Cabling
Term Contract
Post-Bid
Colorado Springs, CO

Martin Drake Power Plant Temporary Natural Gas Generation
Results
CO

On-Call Emergency Generator Service
Alteration
Post-Bid
Colorado Springs, CO 80910

Electric Emergency Response / Reconstruction Services
Results
Colorado Springs, CO 80947

Led Light Source Lamps
Alteration
Post-Bid
Colorado Springs, CO

Last Updated 12/20/2021 01:52 PM
Project Title

Cable Bus System

Physical Address View project details and contacts
City, State (County) CO   (El Paso County)
Category(s) Single Trades, Transportation
Sub-Category(s) Electric, Railroad/Subway
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $560,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The TNGG project will add six General Electric (GE) LM2500Xpress combustion turbine generator units totaling approximately 167 MW of additional generation in a temporary capacity to the Colorado Springs Utilities (Utilities) Martin Drake Power Plant (Drake) site.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 11 - Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents