Similar Projects
Clements Ferry Road Water and Wastewater Relocations Phase 2
Post-Bid
Charleston, SC 29401

Elliott Cut Crossing 20-Inch Water Transmission Main Project
Post-Bid
Charleston, SC 29401

Beach Club Villas Water Main Replacement
Results
Isle of Palms, SC 29451

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Savage Road at Savannah Highway and Etiwan Avenue Water Main Improvements
Post-Bid
Charleston, SC 29401

Port Access Road Water Main Relocations - Phase I-E
Results
Less than $969,977 est. value
Charleston, SC 29401

Savage Road at Savannah Highway and Etiwan Avenue Water Main Improvements
Post-Bid
Charleston, SC 29402

Utilities Locating Services for TTC 2020
Results
Charleston, Hollywood, Moncks Corner, North Charleston, Saint George, SC

Huger Street and King Street Water Main Replacement Project
Post-Bid
Charleston, SC 29401

Installation of Water Meters at Cooper River Court
Results
Charleston, SC 29403

Ben Sawyer Intracoastal Waterway Water Main Crossing
Post-Bid
Charleston, SC 29401

Meter Obstruction Abatement - Harborgate Shores
Results
Mount Pleasant, SC 29464

Materials Contract
Term Contract
Post-Bid
Mount Pleasant, SC 29464

Dunecrest Lane Water Main Replacements
Results
Isle of Palms, SC 29451

Rivers Avenue at TTC 30-Inch Transmission Main Offset
Post-Bid
Charleston, SC 29402

Reported 03/26/2021 12:00 AM
Project Title

Grove, Wagener, and Laurens Streets Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Grove, Wagener, and Laurens Streets Water Main Replacement Project. The Work to be performed consists of the installation of approximately 40 LF of 4-inch DIP water main, 262 LF of 6-inch DIP water main, 5,107 LF of 8-inch DIP water main, and 124 LF of 16-inch DIP water main along Grove Street (from 5th Avenue to 12th Avenue) and Wagener Avenue (from 3rd Avenue to Grove Street), and 273 LF of 12-inch DIP water main Laurens Street (from East Bay Street to Washington Street). The Work also includes the installation of approximately 10 fire hydrants, 53 4-inch thru 12-inch gate valves, 4 16-inch butterfly valves, 6-inch thru 16-inch pipe bell restraints and all other associated appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents