Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

Rehabilitation Of Nw Interceptor - 8 Mile Rd To Tireman
Alteration
Bidding
Detroit, MI

Corrugated Metal Pipe
Infrastructure
Bidding
Grayling, MI

Mont Ripley Slope Stabilization
Post-Bid
Less than $900,000 est. value
Hancock, MI

Repair Waterfront Structures USCG Station St. Ignace St. Ignace, MI
Post-Bid
$500,000 to $1,000,000 est. value
Saint Ignace, MI

Placing Scour Countermeasures, Articulating Concrete Block, Riprap
Results
Bay City, Saint Louis, MI 48706

Placing Scour Countermeasures, Articulating Concrete Block, Riprap
Results
Bay City, Saint Louis, MI 48706

Geddes Lake Peninsula Revetment
Infrastructure
Bidding
Ann Arbor, MI

Slope Restoration
Term Contract
Post-Bid
Clinton, MI

DDA Riverfront Property: Design-Build Seawall Reconstruction
Results
Detroit, MI 48226

Corrugated Metal Culverts
Infrastructure
Bidding
Allegan, MI

Fire Rescue Building Drainage Improvements
Post-Bid
Gwinn, MI 49841

Fish Dam Creek Crossing - Bridge/ Culvert
Results
MI

Concrete Culverts
Infrastructure
Bidding
Allegan, MI

Soil Erosion Products
Infrastructure
Post-Bid
Boon, MI

Last Updated 03/08/2022 01:34 PM
Project Title

Corrugated Metal Pipe

Physical Address View project details and contacts
City, State (County) Saint Clair, MI   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents