Similar Projects
Sunnyside Avenue And Naismith Drive Reconstruction - Phase I
Infrastructure
Bidding
$1,228,000 est. value
Lawrence, KS 66045

N1200 Road Improvements
Infrastructure
Post-Bid
Eudora, KS 66025

Linear Grading, Reinforced Concrete Pipe, Subgrade Modification
Infrastructure, Alteration
Post-Bid
Eudora, KS 66025

Mill and Overlay
Results
$831,421 est. value
KS

Chip and Seal
Results
$535,242 est. value
KS

2021 Crack Seal Program
Infrastructure
Post-Bid
Lawrence, KS

2021 Milling, Patch, Overlay, and Concrete Maintenance Program - Phase 1
Results
Lawrence, KS

2021 Safe Routes to Schools Sidewalk Improvements
Infrastructure
Post-Bid
Lawrence, KS

2021 CDBG Street Restoration
Infrastructure
Results
Lawrence, KS

2021 Curb Inlet Top Replacement
Infrastructure
Post-Bid
Lawrence, KS

Lawrence Loop Bike Trail
Infrastructure
Results
Lawrence, KS

2021 Sidewalk Improvement Program
Infrastructure
Post-Bid
Lawrence, KS

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

9th Street Sidewalk Gap West of Iowa Street - 9th and Iowa Signal Replacement
Infrastructure
Post-Bid
Lawrence, KS

Parking Lots and Roads
Infrastructure
Results
Lawrence, KS

Last Updated 03/07/2022 10:30 AM
Project Title

2022 Pavement Management Program

Physical Address View project details and contacts
City, State (County) Eudora, KS   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists of approximately 871 SY of 8 concrete pavement, pavement removal, 1,665 LF of curb & gutter removal and replacement, 10,902 SY of 2 HMA mill and overlay, full-depth patching, 547 LF of 5 wide concrete sidewalk (4), pavement markings, and traffic control. Alternate No. 1 to include 1,153 SY of 2 HMA mill and overlay, 830 LF of curb & gutter, and traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents