Similar Projects
Oasis Water Treatment Plant Improvements - CIPWA61055 - City of Glendale
Infrastructure
Conception
Glendale, AZ 85303

South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Alteration
Bidding
Phoenix, AZ 85009

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Results

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Germann Road Waterline
Alteration
Construction
Queen Creek, AZ 85142

McKellips Road Natural Gas Line: Country Club to Loop 202 - CP0221 - City of Mesa
Infrastructure
Conception
Mesa, AZ 85205

Water Treatment Services at All District Sites
Infrastructure
Bidding
Tempe, AZ

Festival Ranch Planning Area 2 Infrastructure Effluent Line
Post-Bid
Sun City, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Underground Storage Tank Replacement - Cipfc19037 - City Of Glendale
Alteration
Conception
$615,000 est. value
Glendale, AZ 85301

Construction Manager at Risk - Mesquite Street Lindsay to Val Vista ST2117 Ka-Lo Park- 29th Place Elliot to Mesquite Street
Infrastructure
Bidding
$5,669,000 est. value
Gilbert, AZ

Reported 06/27/2022 01:03 PM
Project Title

Thunderbird Reservoir - CIPWA61045

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85310   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $2,350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construct improvements to increase water quality and water delivery during peak demand and construct roof replacement. As of June 24, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents