Similar Projects
Water Treatment Plant Rehabilation
Renovation
Bidding
Marshallville, GA

Upgrades to Hemphill Pump Station
Renovation
Bidding
Atlanta, GA 30318

Water Treatment Services (Annual Contract)
Term Contract
Post-Bid
Savannah, GA 31401

Loopers WTP Dewatering Facilities Upgrade
Post-Bid
Dalton, GA

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Pump Station 4021 Rehabilitation and Upgrade
Results
Brunswick, GA 31520

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

Chattahoochee River Intake Pump Station
New Construction
Bidding
Atlanta, GA

2019 Water Pollution Control Facilities Rehabilitation Academy Creek BGJWSC
Post-Bid
Brunswick, GA 31520

2016 Splost North Mainland Phase II Pump Station Improvements
Results
Brunswick, GA 31520

Repairs to the Walt Williams Filtration Plant
Renovation
Bidding
Lagrange, GA 30240

Bear Branch Water Supply and Treatment Facility
Post-Bid
GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Results
Less than $748,665 est. value
Cedartown, GA

North Fork Storage Tank and Pump Station
New Construction, Infrastructure
Bidding
GA 30324

Wastewater Treatment System Upgrade
Post-Bid
Atlanta, GA 30336

Last Updated 12/21/2021 11:18 PM
Project Title

Construction of Water System Improvements, Grandview Lake Water Treatment Plant

Physical Address View project details and contacts
City, State (County) GA   (Pickens County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor for the construction of: Division One – Raw Water Pump Station: Construction includes site work, electrical, mechanical, piping, painting and appurtenances. Division Two – Water Treatment Plant: Construction includes site work, building, ceramic membrane treatment unit, electrical, mechanical, piping, painting and appurtenances. Construction also includes 500,000 gallon prestressed concrete ground storage tank, site work, piping, painting and appurtenances.

Details

Lift and Pump Stations, Renovation, Water Treatment Plant, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents