Similar Projects
East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Harris Teeter #345
Renovation - 58,652 SF
Construction
$3,509,985 est. value
Burlington, NC 27215

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Upgrading U.S. 70 to a Freeway
Results
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

Crossfield Taxiway - Package 1
Post-Bid
Greensboro, NC 27409

Asphalt Resurfacing
Results
Hillsborough, NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Widens I-95 to Eight Lanes and Reconstructs Interchanges from South of I-95 Business / US 301 (Exit 56) to North of SR 1002 (Long Branch Road - Exit 71) in Cumberland and Harnett Counties.
Results

Construction Manager for UNC Charlotte East Village Infrastructure
Post-Bid
Less than $6,000,000 est. value
Charlotte, NC

Wrightsville Beach Paving Project
Results
Wrightsville Beach, NC

Last Updated 11/18/2020 06:20 AM
Project Title

Grading, Drainage, Paving and Structure

Physical Address View project details and contacts
City, State (County) NC   (Edgecombe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway Items Lump Sum Ls Mobilization Lump Sum Ls Construction Surveying Lump Sum Ls Type Ii Modified Approach Fill, Station ******* (16+80 -l-) Lump Sum Ls Type Ii Modified Approach Fill, Station ******* (31+08.50 -l-) Lump Sum Ls Type Ii Modified Approach Fill, Station ******* (35+90.50 -l-) 300 Cy Undercut Excavation Lump Sum Ls Grading 1 Acr Supplementary Clearing & Grubbing 300 Cy Select Granular Material 300 Sy Geotextile For Soil Stabilization 440 Sy Rock Plating 100 Ton Incidental Stone Base 340 Sy Incidental Milling 530 Ton Asphalt Conc Base Course, Type b25.0c 1,400 Ton Asphalt Conc Surface Course, Type s9.5b 120 Ton Asphalt Binder For Plant Mix 44.8 Cy Subdrain Excavation 200 Sy Geotextile For Subsurface Drains 33.6 Cy Subdrain Coarse Aggregate 200 Lf 6" Perforated Subdrain Pipe 1 Ea Subdrain Pipe Outlet 6 Lf 6" Outlet Pipe 250 Lf Shoulder Berm Gutter 10 Ea Modified Concrete Flume 675 Lf Steel Beam Guardrail 5 Ea Additional Guardrail Posts 12 Ea Guardrail Anchor Units, Type Iii 12 Ea Guardrail End Units, Type Tl-3 13 Ton Rip Rap, Class b 412 Sy Geotextile For Drainage 770 Sf Work Zone Signs (Stationary) 130 Sf Work Zone Signs (Barricade Mounted) 80 Lf Barricades (Type Iii) 36,800 Lf Paint Pavement Marking Lines (4") 6,450 Lf Temporary Silt Fence 115 Ton Stone For Erosion Control, Class a 10 Ton Stone For Erosion Control, Class b 160 Ton Sediment Control Stone 4 Acr Temporary Mulching 300 Lb Seed For Temporary Seeding 1.5 Ton Fertilizer For Temporary Seeding 200 Lf Temporary Slope Drains 4,400 Lf Safety Fence 25 Cy Silt Excavation 1,650 Sy Matting For Erosion Control 100 Sy Coir Fiber Mat 775 Lf 1/4" Hardware Cloth 300 Sy Floating Turbidity Curtain 4 Ea Special Stilling Basins 150 Lf Coir Fiber Wattle 4 Acr Seeding & Mulching 2 Acr Mowing 50 Lb Seed For Repair Seeding 0.25 Ton Fertilizer For Repair Seeding 100 Lb Seed For Supplemental Seeding 2.5 Ton Fertilizer Topdressing 980 Lf Impervious Dike 10 Mhr Specialized Hand Mowing 25 Ea Response For Erosion Control 3 Ea Concrete Washout Structure 0.1 Acr Reforestation Structure Items Lump Sum Ls Removal Of Existing Structure At Station ************ (16+80.00 -l-) Lump Sum Ls Removal Of Existing Structure At Station ************ (31+08.50 -l-) Lump Sum Ls Removal Of Existing Structure At Station ************ (35+90.50 -l-) Lump Sum Ls Asbestos Assessment 3 Ea Pda Testing Lump Sum Ls Unclassified Structure Excavation At Station ******** (16+80.00 -l-) Lump Sum Ls Unclassified Structure Excavation At Station ******** (31+08.50 -l-) Lump Sum Ls Unclassified Structure Excavation At Station ******** (35+90.50 -l-) 138.7 Cy Class a Concrete (Bridge) Lump Sum Ls Bridge Approach Slabs, Station ************ (16+80.00 -l-) Lump Sum Ls Bridge Approach Slabs, Station ************ (31+08.50 -l-) Lump Sum Ls Bridge Approach Slabs, Station ************ (35+90.50 -l-) 23,370 Lb Reinforcing Steel (Bridge) 42 Ea Pile Driving Equipment Setup For *** Steel Piles (Hp 12 x 53) 40 Ea Pile Driving Equipment Setup For *** Galvanized Steel Piles (Hp 14 x 73) 2,170 Lf Hp12x53 Steel Piles 2,400 Lf Hp14x73 Galvanized Steel Piles 44 Ea Pile Redrives 861.5 Lf Vertical Concrete Barrier Rail 1,030 Ton Rip Rap Class Ii (2`-0" Thick) 1,123 Sy Geotextile For Drainage Lump Sum Ls Elastomeric Bearings 4,730 Lf 3`-0" x 1`-9" Prestressed Conc Cored Slabs 849.25 Lf Generic Structure Item Fiber Optic Conduit System

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents