Similar Projects
Compost Processing Building (Phase 2C)
New Construction, Infrastructure
Results
MD

Compost Facility Phase II
Results
$1,000,001 to $2,500,000 est. value
Marriottsville, MD 21104

Power Infrastructure Replacement
Term Contract
Post-Bid
Derwood, MD 20855

Construction Services for the Gude Landfill Remediation Project
Post-Bid
Less than $61,750,000 est. value
Rockville, MD 20850

Maintenance and Preservation of Environmental Assets
Infrastructure
Results
$100,000 to $500,000 est. value

Maintenance and Preservation of Environmental Assets
Infrastructure
Results
$100,000 to $500,000 est. value

Maintenance and Preservation of Environmental Assets
Infrastructure
Results
$100,000 to $500,000 est. value

Construction for Charles County Landfill Cell 4A
Infrastructure
Results
La Plata, MD

Maintenance and Preservation of Environmental Assets
Infrastructure
Results
MD

Brown Station Road Sanitary Landfill Phase V Landfill Gas Expansion
Infrastructure
Results
Upper Marlboro, MD 20774

Landfill Leachate Management System
Term Contract
Bidding
Waldorf, MD 20602

Alpha Ridge Landfill East Leachate System Improvements
Results
$100,001 to $500,000 est. value
Columbia, MD 21046

Cell 2 Horizontal Gas Collection Condensate Tie-ins to Leachate Header Midshore II Regional Solid Waste Facility
Infrastructure
Results
Ridgely, MD 21660

Gude Landfill Remediation Project
Infrastructure
Post-Bid
Rockville, MD 20850

Barn Replacement Brown Station Road Sanitary Landfill
Renovation, Infrastructure
Post-Bid
Upper Marlboro, MD 20774

Last Updated 01/27/2022 04:00 AM
Project Title

Newland Park Landfill Cells 8 and 10 Construction

Physical Address View project details and contacts
City, State (County) Salisbury, MD 21801   (Wicomico County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all labor, materials, tools, supervision, transportation, and installation equipment necessary to place and compact soil as specified in this Section, as shown on the Drawings, and in accordance with the Construction Quality Assurance (CQA) Plan. Soil described in this Section shall be used for construction as follows. Structural Fill shall be the soil used to construct the perimeter berm, base of the landfill cell, support of the access roads and structures, and other uses under structural loads. Compacted Clay Liner (CCL) shall be the soil used as the low-permeability component below the liner system geosynthetics. Protective Cover drainage layer shall be soils used to construct the Protective Cover/leachate collection zone above the liner system geosynthetics. Topsoil shall be used to support permanent vegetation. Common fill shall be used for general grading purposes in areas without structural loads, unless otherwise specified.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents