Similar Projects
FY21 USACE Galveston District, FY21 Houston Ship Channel Oyster Mitigation, Harris County, Texas
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Houston, TX

Port Freeport Harbor Improvement Project Reach #2, Bend Easing Mechanical Excavation In Brazoria County, Texas.
Term Contract
Design
$1,000,000 to $5,000,000 est. value
TX

Culvert Repairs 2021
Infrastructure
Bidding
$570,000 est. value
Angleton, TX

Lake Erosion Repairs, Phase 1 for Lakes of Highland Glen
Infrastructure
Bidding
TX

Piper Road Drainage Project
Post-Bid
Pearland, TX

CDBG-DR Drainage and Paving Improvements
Post-Bid
Holiday Lakes, TX

Freeport Harbor Levee Stabilization Wall Project
Results
Freeport, TX 77541

Manvel Town Center Public Detention Ponds Phase 1A and Manvel Town Center Public Utilities Phase 1A
Results
TX

Proposed Paving and Storm Water Facilities to serve Davenport Parkway and Discovery Drive at Alvin ISD
Post-Bid
TX

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Lake Amenity/Detention Basin and Stormsewer to Serve Massey Oaks Phase 1
Infrastructure
Post-Bid
TX

Mimosa Acres Drainage Improvements
Results
Less than $1,047,830 est. value
Pearland, TX 77581

Repair and Rehabilitation of the Caroline Tunnels for Harris County Precinct 2
Infrastructure
Post-Bid
Houston, TX

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Meridiana Eighty One B
Results
TX

Construction of Water, Sanitary, and Drainage Facilities Sierra Vista West Section 7
Infrastructure
Post-Bid
TX

Last Updated 02/02/2022 03:34 AM
Project Title

Detention Basin T Phase 3, Detention Basin V Phase 2, Detention Basin M-2, Detention Basin N-2 and Earthwork To Serve Meridiana

Physical Address View project details and contacts
City, State (County) TX   (Brazoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope shall include approximately 40 acres of light clearing, 3 acres of heavy clearing, 225,000 CY of pond excavation and 1,300 LF of 24”- 48” RCP storm sewer.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents