Similar Projects
As-Needed Miscellaneous Pipeline Construction
Results
New Port Richey, FL 34654

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Colonial Manor Water Main Replacement Phase 3
Results
New Port Richey, FL 34655

Comprehensive Wet Fire Sprinkler Systems / Fire Hydrant Services and Equipment
Term Contract
Post-Bid
New Port Richey, FL 34654

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Madison Street Reclaimed Water Main Extension
Results
$595,000 est. value
New Port Richey, FL 34652

Boyette Road Reclaimed Water Main Extension
Results
$651,000 est. value
Wesley Chapel, FL 33545

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Curley Street Water Main Relocation
Post-Bid
San Antonio, FL 33576

As Needed Pipeline Repairs Contract
Term Contract
Results
Less than $1,000,000 est. value
FL

Reclaimed Water Pipeline Extension - Phase 1
Results
$1,500,000 est. value
Zephyrhills, FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Inspection of Fire Hydrants
Term Contract
Results
Less than $10,075 est. value
FL

Colonial Manor Water Main Replacement Phase 4
Bidding
New Port Richey, FL 34655

Last Updated 05/12/2021 02:15 AM
Project Title

Hilltop Drive Water Main Interconnect

Physical Address View project details and contacts
City, State (County) New Port Richey, FL 34654   (Pasco County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the installation of approximately 160 linear feet of 6-inch diameter and 8,120 linear feet of 8-inch diameter water main piping along Hilltop Drive and Jasmine Boulevard, with interconnection to existing piping in three (3) locations; installation of eighteen (18) fire hydrant assemblies along the route, along with numerous fittings, valves, air release assemblies, etc.; installation of up to seventy (70) water meter service laterals from the new water main piping to the adjacent residential property boundaries.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents