Similar Projects
Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

The Bristal at Boca Raton
New Construction, Build-Out, Demolition - 331,605 SF
Conception
Boca Raton, FL 33432

International Swimming Hall of Fame Complex
New Construction - 20,000 SF
Design
$70,900,000 est. value
Fort Lauderdale, FL

Mandarin Parc
New Construction - 209,760 SF
Design
Homestead, FL 33032

Construction Managers - Football Operations Facility
New Construction - 150,000 SF
Bidding
Tallahassee, FL

Air Lab Fitness Studio
Renovation - 2,442 SF
Bidding
Miami, FL 33139

Body Bar
Renovation - 2,761 SF
Sub-Bidding
Tampa, FL 33602

770 Apartments
New Construction - 79,981 SF
Post-Bid
$3,000,000 est. value
Saint Petersburg, FL 33701

Continuing Contracts for Construction Manager at-Risk Services
Post-Bid
Plant City, FL

Fort Family Regional Park - Baseball Complex
New Construction - 1,746 SF
Results
Jacksonville, FL 32256

Magee Field Improvements
Results
Pensacola, FL

Kindred - Phase 2
New Construction - 1,906,608 SF
Construction
Kissimmee, FL 34744

627 North Federal
New Construction - 444,656 SF
Construction
$100,000,000 est. value
Fort Lauderdale, FL 33304

Aero Vue Crossings
New Construction
Pending Verification
Kissimmee, FL

Serenity
New Construction
Pending Verification
Spring Hill, FL 34609

Last Updated 04/21/2022 08:44 AM
Project Title

South County Sports Complex at PSC

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32507   (Escambia County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility, Fitness Center
Contracting Method Competitive Bids.
Project Status Design Development, Seeking Funding, Bidding Expected third quarter 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, New Construction, Athletic Facility, New Construction, 23 Acres.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents