Similar Projects
Learn4Life Austin
New Construction
Conception
Austin, TX 78758

Job Order General Construction Contracts
Bidding
Corpus Christi, TX 78401

New Van Vleck Elementary School
Post-Bid
Less than $18,100,000 est. value
Van Vleck, TX 77482

Kipp South Campus Phase I Classroom Building
Post-Bid
Houston, TX 77085

Hunters Creek Elementary School Replacement
New Construction - 108,000 SF
Results
Less than $22,000,000 est. value
Houston, TX 77024

New Elementary School No 43
New Construction
Results
Less than $28,915,118 est. value
Katy, TX

Ace Montessori School
New Construction - 12,457 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Frisco, TX 75035

Elementary No. 29 - Alternates Proposal
New Construction - 116,450 SF
Construction
Less than $25,823,400 est. value
Humble, TX

Woodrow Wilson Elementary School Replacement Project
Post-Bid
Denton, TX 76209

Multi-Campus Kitchen Renovation Project
Renovation
Results
$1,500,000 est. value
Austin, TX 78729

Bess Brannen Elementary School Replacement
Construction
Lake Jackson, TX 77566

Gulledge Elementary Classroom Addition
Addition
Post-Bid
$3,400,000 est. value
Plano, TX 75024

Jill Stone Elementary School
New Construction
Results
Less than $27,634,000 est. value
Dallas, TX 75231

Renovations to Treasure Forest and Buffalo Creek Elementary Schools
Renovation
Construction
$16,000,000 est. value
Houston, TX 77055

New Elementary and Sixth Grade Schools - Package 1
New Construction
Post-Bid
Crosby, TX 77532

Last Updated 11/07/2019 09:12 AM
Project Title

Multi-Campus Renovation Project 2

Physical Address View project details and contacts
City, State (County) Round Rock, TX 78665   (Williamson County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Caldwell Heights Elementary School: This will include the complete replacement of all existing HVAC equipment both inside and outside to include, but not limited to all AHU’s, MAU’s, CU’s, EF’s, HP’s, and RTU’s. The complete replacement of the existing HVAC controls system to include, but not limited to all control modules, wiring and programming. The complete replacement of the existing low slope roofing system to include, but not limited to all roof drains, gutters, scuppers, downspouts, roof curbs, roof penetrations, etc.. Double File Elementary School: This will include the complete replacement of all existing HVAC equipment both inside and outside to include, but not limited to all AHU’s, MAU’s, CU’s, EF’s, HP’s, RTU’s and gravity ventilators. The complete replacement of the existing HVAC controls system to include, but not limited to all control modules, wiring and programming. The complete replacement of the existing metal roofing system to include, but not limited to gutters, scuppers, downspouts, roof curbs, roof penetrations, etc... Forest North Elementry School: This will include the complete replacement of all existing HVAC equipment both inside and outside to include, but not limited to all AHU’s, MAU’s, CU’s, EF’s, HP’s, and RTU’s. The complete replacement of the existing HVAC controls system to include, but not limited to all control modules, wiring and programming. The replacement of select electrical panels inside the building. The complete replacement of the existing low slope roofing system to include, but not limited to all roof drains, gutters, scuppers, downspouts, roof curbs, roof penetrations, etc...

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents