Similar Projects
Last Updated | 06/21/2022 11:51 AM |
Project Title | Green Holly Elementary School - Roof/HVAC Systemic Renovation - PS-2301 - St. Mary's County Public Schools |
Physical Address | View project details and contacts |
City, State (County) | Lexington Park, MD 20653 (Saint Marys County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $10,533,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Renovation of an educational facility in Lexington Park, Maryland. Conceptual plans call for the renovation of a educational facility. As part of the annual update of the Comprehensive Maintenance Plan, the roof and HVAC replacement projects are reviewed. This project will replace 46,450 square feet. of existing bituminous roof on Building A that is failing and 6,185 square feet of existing bituminous roof on Building B that is failing. This project does not include the area (51,740 square feet) of Building B that was funded for replacement in FY 2019/FY 2020. The Building A roof was last replaced in 1992 and will be 33 years old at the time of replacement. The subject portion of the Building B roof was last replaced in 1999 and at the time of completion will be 26 years old. The project also includes the replacement of the HVAC system for Building B, which was last replaced in 1992. At the time of completion of the project, the system will be 32 years old. Maintenance monitors the roof and HVAC system and provides repairs on an as-needed basis, pending the replacements. Local funds are being requested in FY 2023 for completion of a study and partial design in advance of the project. As of June 20, 2022, this project is currently in the FY 2022-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||
Details | Elementary School, Renovation.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |