Similar Projects
Peru State College - Geothermal Utilities Project
Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Peru, NE 68421

Pouring of Concrete for a Variety of Areas
Infrastructure
Post-Bid
$200,000 CJ est. value
Brownville, NE 68321

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Statewide - Storage Buildings
New Construction, Infrastructure
Results
$1,092,000 CJ est. value
Johnson, NE 68379

Brock West
Infrastructure
Post-Bid
$996,187 CJ est. value
Auburn, NE 68305

CWF Sewer Lining
Infrastructure
Results
$223,017 CJ est. value
Auburn, NE 68305

Statewide - Fabric Structures
New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Johnson, NE 68379

Johnson-Brock Public School Addition
Addition, Demolition, Renovation, Infrastructure
Results
$2,337,000 CJ est. value
Johnson, NE 68378

Bituminous, General (All Classes)
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Auburn, NE 68305

2021 Street Improvements
Infrastructure
Post-Bid
$1,040,000 CJ est. value
Peru, NE 68421

Replacement and Addition of Concrete to the Parking Lot, Driveways, and Walkways at Its Office
Infrastructure
Post-Bid
$300,000 CJ est. value
Auburn, NE 68305

Last Updated 06/23/2023 11:01 AM
Project Title

Auburn 2022 Street Improvements

Physical Address View project details and contacts
City, State (County) Auburn, NE 68305   (Nemaha County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,068,560 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 06/23/23, All bids were rejected. This project will go back out for a rebid. A timeline for rebidding has not been decided at this time. Street/Road Repairs, Pavement Resurface and Rehabilitation, Sidewalks/Curbs/Gutters, Street/Roadway Reconstruction , Paving (Highway, Road or Street Full-depth asphalt reconstruction of S Street from Central Avenue to 140-ft. south of 8th Street and P Street from 10th Street to 6th Street. Improvements will consist of replacing the existing rock surface with a new, 2-lane (24-foot wide) asphalt street, concrete curb and gutter in various locations, asphalt or concrete driveway aprons, and new culvert pipes

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents