Similar Projects
Antioch Road District Materials Supply
Post-Bid
Antioch, IL 60002

Supply of Asphalt Emulsion, Sealer Materials
Term Contract
Post-Bid
West Chicago, IL 60185

Golf Center Pavement Maintenance
Results
Des Plaines, IL 60016

Roadway & Bridge Widening & Reconstruction
Results
Chicago, IL 60600

A1 and A2 Seal Coat
Post-Bid
Amboy, IL 61310

Gregory Avenue and Somerset Drive Reconstruction
Results
$1,081,025 est. value
Glendale Heights, IL 60139

Reclamite Asphalt Rejuvenator and CRF Restorative Seal
Post-Bid
Johnsburg, IL

2020 Street Resurfacing Program
Results
Elgin, IL 60120

Annual Crack Seal and Seal Coating
Post-Bid
Joliet, IL 60433

Sealcoating
Renovation
Results
Island Lake, Wauconda, IL 60084

Annual Asphalt Repair and Replacement
Post-Bid
Joliet, IL 60433

Harmony Road Bridge Repairs
Renovation
Results
$93,995 est. value
Marengo, IL 60152

Street Maintenance Materials
Post-Bid
Park Ridge, IL 60068

2020 Street Improvements
Results
Glenview, IL 60026

Surface Pavement Repairs
Term Contract
Post-Bid
Rockford, IL 61109

Last Updated 08/03/2020 09:06 AM
Project Title

Resurfacing CH 8 From IL 15 to 5th Street in Bluford

Physical Address View project details and contacts
City, State (County) Bluford, IL 62814   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

40200800 Ton Aggregate Surface Course, Type b Base Items 50.000 40600290 Pound Bituminous Materials (Tack Coat) Base Items 7,350.000 40602970 Ton Hot-Mix Asphalt Binder Course, Il-9.5fg, n70 Base Items 1,350.000 40604050 Ton Hot-Mix Asphalt Surface Course, Il-9.5, Mix "c", n50 Base Items 1,750.000 44000157 Sq Yd Hot-Mix Asphalt Surface Removal, 2" Base Items 550.000 48102100 Ton Aggregate Wedge Shoulder, Type b Base Items 400.000 67100100 l Sum Mobilization Base Items 1.000 70100460 l Sum Traffic Control And Protection, Standard 701306 Base Items 1.000 70300100 Foot Short Term Pavement Marking Base Items 2,600.000 70300150 Sq Ft Short Term Pavement Marking Removal Base Items 450.000 78000200 Foot Thermoplastic Pavement Marking - Line 4" Base Items 19,183.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents