Similar Projects
Last Updated | 10/15/2021 09:38 AM |
Project Title | Hulett and Jennison Waterline Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | OH (Lake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $549,900 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The installation of 29 feet of new 6 Inch Water Main Polyvinyl Chloride Pipe, AWWA C909, PC 235 PSI with AWWA CL. 53 Ductile Iron Fittings along E. 340th St. and 1,872 feet of new 8 Inch Water Main Polyvinyl Chloride Pipe, AWWA C909, PC 235 PSI with AWWA CL. 53 Ductile Iron Fittings 14 feet north of the Jennison St southern right of way line, 8 feet east of the Hulett Ave western right of way line, and 12 feet north of the Eastlawn Drive southern right of way line including a tie-in to the E. 340th St waterline. The new waterline will include 6 new hydrants, 20 long side water service connections and 21 short side water service connections and meter boxes. The existing 6” waterline, hydrant branches and gate valves are to be removed. Pavement restoration at the tie-ins to E. 340th St and along Jennison St and Eastlawn Drive shall consist of 1-1/2 inches of ODOT Item 441, Surface Course over 2 inches of ODOT ITEM 441, Intermediate Course and 6 inches of ODOT 301, Asphalt Concrete Base. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |