Similar Projects
Construction of a Five (5) Single-family Housing Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Green River, UT 84525

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Construction of the Muddy Creek Irrigation
Infrastructure, Alteration
Results
Emery, UT

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

Reclamation of BLM Pits, Rochester, South Moore and Lila Canyon
Infrastructure
Post-Bid
$223,000 est. value
Castle Dale, UT

CC and H Canal Pipeline Installation Project
Infrastructure
Results
$365,551 CJ est. value
Castle Dale, UT 84513

Sidewalk Project, 2022
Infrastructure
Post-Bid
$80,000 CJ est. value
Orangeville, UT 84537

Department of Natural Resources Green River State Park Campground and Lodging Expansion
Addition, Demolition, Infrastructure
Results
$3,676,951 CJ est. value
Green River, UT 84525

Farmington Bay Dyke-Line Restoration
Infrastructure
Post-Bid
$300,000 CJ est. value
Orangeville, UT 84537

Lower Miller Creek BDAs
Infrastructure
Results
$20,000 CJ est. value
Orangeville, UT 84537

Applecross Station Visitor Center
Infrastructure
Post-Bid
$60,000 CJ est. value
Orangeville, UT 84537

Castle Dale City Bike Trail Project 2023
Infrastructure
Results
$199,879 CJ est. value
Castle Dale, UT 84513

Zion Mountain Local Service District - Applecross Station Visitor Center General Contractor - Main Building
New Construction, Infrastructure
Post-Bid
$170,000 CJ est. value
Orangeville, UT 84537

Fiber Connection From the Garfield County Sheriff's Office to the Cedar PSAP
Infrastructure
Post-Bid
$370,000 CJ est. value
Orangeville, UT 84537

Last Updated 04/17/2023 09:39 AM
Project Title

Construction of Drainage Project 2023

Physical Address View project details and contacts
City, State (County) Castle Dale, UT 84513   (Emery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $177,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Major items of work include: 1. 8-inch C-900 Pipe - 3,500 L.F. 2. 10-inch C-900 Pipe - 2,450 L.F. 3. 15-inch ADS Pipe - 300 L.F. The Owner reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the District.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents