Similar Projects
Deck Replacement, Approach Slabs, Rehab Abutments, Bridge Painting
Infrastructure
Conception
$1,846,000 CJ est. value
Sioux Falls, SD 57107

Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$9,473,000 est. value
Huron, SD 57399

Alcester WWTF Improvements
Renovation, Infrastructure
Design
$4,917,634 CJ est. value
Alcester, SD 57001

Remove and Replace PCC Surfacing Replace Str, Grading
Infrastructure
Design
$34,171,000 est. value
Humboldt, SD 57035

Big Bend Left Abutment Collector Pipe System
Infrastructure
Bidding
$4,000,000 CJ est. value
Fort Thompson, SD 57339

Oahe Project Pier 10 Bridge Rocker Bearing Modification
Infrastructure
Bidding
$250,000 CJ est. value
Pierre, SD 57501

Airport Improvements
New Construction
Post-Bid
Hot Springs, SD 57747

Miller Ranch Subdivision Phase 1
Post-Bid
Spearfish, SD 57783

Hurley Center Avenue Street and Utility Improvements
Results
$2,000,000 to $2,300,000 est. value
Hurley, SD 57036

Basin 371/373 Channel Improvements - South Wheatland Avenue to South Grinnell Avenue Grading and Storm Drain
Results
$377,195 est. value
Sioux Falls, SD 57106

The Crossroads Mixed Commercial Development
New Construction, Demolition, Infrastructure
Pending Verification
Sioux Falls, SD

Net-Zero 1 Biofuel Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$980,000,000 CJ est. value
Lake Preston, SD 57249

Quincy Street Watermain Replacement - 50835 - City of Rapid City
Infrastructure
Conception
$850,000 CJ est. value
Rapid City, SD 57701

Signing and Delineation - Gravel Roads
Alteration
Design
$1,100,000 est. value
Deadwood, SD

Timm Lane Replacement Structure
Infrastructure
Bidding
$200,000 CJ est. value
Deadwood, SD 57732

Last Updated 09/12/2022 08:37 AM
Project Title

Repair and Restore Berms

Physical Address View project details and contacts
City, State (County) Alexandria, SD 57311   (Hanson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $345,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I90 EBL & WBL - 0.9 W McCook Co Line over Wolf Ck Length 0.0 As of September 12, 2022, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Repair and Restore Berms *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents