Similar Projects
Jefferson Intermediate & Middle School Renovations
Renovation
Conception
Pella, IA 50219

Pella High School Athletics Stadium Additions
Addition
Conception
Pella, IA 50219

W. Washington Street and Fifield Road Intersection Improvements
Infrastructure
Design
$291,255 CJ est. value
Pella, IA 50219

W. Washington Street and Fifield Road Intersection Improvements
Infrastructure
Design
$291,255 CJ est. value
Pella, IA 50219

East Interchange Infrastructure Improvements – 250th Avenue Improvements
Infrastructure
Results
Pella, IA

PCC Pavement - New
Infrastructure
Results
IA

Knoxville Hospital & Clinics Emergency Department Expansion
Addition, New Construction, Infrastructure
Conception
$2,100,000 CJ est. value
Knoxville, IA 50138

PCC Patching - G28
Infrastructure
Results
IA

September 2021 Bond - Melcher-Dallas School District
New Construction, Renovation, Infrastructure
Conception
$5,750,000 CJ est. value
Melcher Dal, IA 50062

2022 Street Improvements
Renovation, Infrastructure - 109,998 SF
Results
$928,313 est. value
Knoxville, IA

Hma Resurfacing with Milling
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

Granular Surfacing of Roadway
Infrastructure
Results

250th Avenue Reconstruction
Infrastructure
Results
$429,776 est. value
Pella, IA 50219

Bos Landen Drive Reconstruction
Infrastructure
Results
Pella, IA 50219

Last Updated 10/28/2022 04:36 PM
Project Title

Pella CSD Early Childhood Center Phase 1

Physical Address View project details and contacts
City, State (County) Pella, IA 50219   (Marion County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Maintenance, Middle/Senior High School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center - 05/27/22
Owner View project details and contacts
Architect View project details and contacts
Description

Pella Community School District - Early Childhood Center Early Sitework - Bid Package #31 - Grading Bid Package #32 - Concrete Paving Target dates: start work July 15 th , 2022, complete work November 1st, 2022. Project documents governing the proposed work have been prepared by Neumann Monson. Bid security in the amount of 10% of the total bid must accompany each Bid in accordance with the Instruction to Bidders. The successful bidder shall be required to furnish a Performance Bond and a Payment Bond, each in an amount equal to the Bid, guaranteeing faithful performance of the Contract. No bidder may withdraw its bid for a period of sixty [60] business days after the date and hour set for opening of bids. The Pella Community School District Board of Education will meet in the Library at the High School, 212 East University St., Pella, IA 50219 on June 23rd, 2022, at 4:30 p.m. for a hearing on the proposed plans, specifications, form of contract, and estimated total cost. A public hearing will be conducted at a meeting to be held in the Library at the High School, 212 East University St., Pella, IA 50219 on June 23rd, 2022, at 4:35 p.m., for a hearing on bid results and award recommendations. The award of the contract may be made by the Pella Community School District to any responsive, responsible bidder or bidders offering suitable supplies, equipment and/or service at the lowest price taking into consideration the quality of material or service in the best interest of the Pella Community School District. The right is reserved to reject any and all bids, or any part thereof, and to waive informalities, and to enter into such contract as shall be deemed in the best interest of the Pella Community School District. Deposit checks will be refunded if documents are returned to Iowa Reprographics within fourteen (14) days after the bid due date. Checks are to be made out to Iowa Repro. PN - B2202684

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents