Similar Projects
Beach Club Renovations
Renovation
Conception
$125,000,000 est. value
Minneapolis, MN 55416

Lewis Park Shelter Building Replacement - 15-049 - City of Edina
Demolition, New Construction, Infrastructure
Conception
$900,000 CJ est. value
Edina, MN 55435

Glen Lake Apartments
New Construction - 19,081 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Minnetonka, MN 55345

Edison at Maple Grove
New Construction
Design
Maple Grove, MN

TSG Senior Apartments
New Construction, Infrastructure - 300,000 SF
Post-Bid
Golden Valley, MN 55422

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 9,200 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

2022 Creek Valley Site Improvements
Infrastructure
Results
Edina, MN

Edina Community Center 2022 Site Repairs
Infrastructure
Results
Edina, MN 55424

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Bde Maka Ska Refectory
New Construction, Infrastructure - 9,890 SF
Construction
$6,225,700 CJ est. value
Minneapolis, MN 55408

Huntington Bank Stadium Phase 1
Renovation - 20,000 SF
Pending Verification
Minneapolis, MN 55414

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

New Fire Station No. 11 - FIR11 - City of Minneapolis
New Construction, Infrastructure
Conception
$9,144,000 CJ est. value
Minneapolis, MN 55414

Rivers Edge Assisted Living
New Construction, Infrastructure - 28,598 SF
Design
$8,000,000 CJ est. value
Brooklyn Park, MN 55443

Walgreens #16279 / Minneapolis
New Construction, Infrastructure - 75,000 SF
Post-Bid
$20,000,000 CJ est. value
Minneapolis, MN 55406

Last Updated 06/05/2023 01:30 PM
Project Title

Community Center / Brooklyn Center

Physical Address View project details and contacts
City, State (County) Brooklyn Center, MN 55430   (Hennepin County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $55,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Brooklyn Center is requesting proposals for a community center master plan. The Method of Contractor Selection has not been determined at this time. As of June 5, 2023, the master plan study is being completed. A firm bidding and construction timeline has yet to be announced. Funding also has to be obtained. The first phase would include the new competition-size pool with seating for spectators, a full renovation of the existing building, community meeting rooms and a cafe. The second phase, targeted for construction in 2025, would include the four-court gym facility with an elevated running track and a fitness mezzanine. The third and final phase, with a target construction date of 2027, would include the addition of a warmer-water recreation pool and splash pad and party rooms.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents