Similar Projects
Lift Station System Replacement
Results
Irving, TX 75062

Lawson Road Lift Station In-Line Flow Storage Basin
Results
Dallas, TX 75253

Danieldale Pump Station Rehabilitation - Phase 1 Construction
Results
Duncanville, TX 75137

High Service Pump Station Pumping Unit Replacement
Results
Dallas, TX 75235

Addison Kellway Lift Station By-Pass Project
Bidding
Addison, TX 75001

Ard Road Pump Station Upgrades Contract 1
Post-Bid
$150,000 est. value
Seagoville, TX 75159

Walcrest Pump Station and Walnut Hill Pump Station Site and Security Improvements
Results
$1,819,744 est. value
Dallas, TX 75201

Matthew Holzapfel Pump Station
Results
Less than $12,745,860 est. value
Mesquite, TX

DCRRD Pump Station Upgrade Project 2020
Results
Carrollton, TX 75010

Robinson Road Pump Station
Results
$8,615,000 est. value
Grand Prairie, TX 75050

Fireside by the Lake, Phase 1 - Lift Station Improvements
Bidding
Dallas, TX 75295

Rowlett Road Lift Station Upgrades
Results
$442,350 est. value
Rowlett, TX 75030

Sherwood Wastewater Lift Station (Various Locations)
Results
Cedar Hill, TX 75104

Highland Park Meter Station Rehabilitation
Results
$313,800 est. value
Highland Park, TX 75205

Southwest Sector Pump Station - Phase 2
Results
$8,000,000 to $9,000,000 est. value
Grand Prairie, TX 75050

Last Updated 07/24/2020 10:25 AM
Project Title

Gillion Pump Station Improvements Electrical Upgrade

Physical Address View project details and contacts
City, State (County) Dallas, TX 75200   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $585,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes,but is not limited to, the following major work items: 1. Replacing existing motor starters with a new NEMA 3R 480V motor control center. 2. Providing and installing a new booster water pump and motor. 3. Modifying the existing sump pump operation and making other miscellaneous modifications.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents