Similar Projects
Ravine and Streambank Site Restoration
Conception
$43,900 est. value
Beach Park, IL 60085

2020 Drainage Program Survey, Design and Permitting Services
Conception
Barrington, IL 60010

Harrison Street Viaduct West of Chicago River
Infrastructure
Bidding
Chicago, IL

Box Culvert Replacements
Infrastructure
Bidding
IL

JMTC-RI Concrete Trench Fill-In
Post-Bid
Rock Island, IL 61299

Corrugated Steel Pipe
Post-Bid
Knoxville, IL 61448

I-20-4537 - I-490 Compensatory Storage Construction
Results
IL

North Pope Creek Bridge Replacement
Results
Viola, IL 61486

Cured-In-Place Pipe Liners on Il 96 in Atlas
Infrastructure
Bidding
IL

Pipe Culverts
Post-Bid
Hardin, IL 62047

2020 Mft Maintenance Paving
Renovation
Results
Dwight, IL 60420

Pavement Reconstruction, New Sidewalks and Drainage Improvements on North Prairie Street from Corbin Street to Dorothy Street in Bethalto
Infrastructure
Bidding
Bethalto, IL

Flood Mitigation Services - Scott AFB
Post-Bid
Belleville, IL 62225

Clayton Street Drainage and Overlay
Results
Less than $61,857 est. value
Cherry Valley, IL 61016

2021 Drainage Improvements Project
Infrastructure
Bidding
Hoffman Estates, IL

Last Updated 09/17/2021 03:17 PM
Project Title

Eastgate Industrial Parkway Culvert Improvements

Physical Address View project details and contacts
City, State (County) Kankakee, IL 60901   (Kankakee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents