Similar Projects
Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Oil & Chip Project
Post-Bid
Mattoon, IL

Resurfacing Various Routes within Charleston
Results
Charleston, IL

0.2 Miles of Patching and Resurfacing on Lerna Road from North of Samsa Drive to IL 16
Results
Mattoon, IL 61938

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Bituminous Materials
Post-Bid
Ashmore, IL

1.9 Miles of Patching on US 45 / IL 121 from IL 16
Results
Mattoon, IL

HMA Surface Removal
Infrastructure
Post-Bid
Charleston, IL

Class C Patches
Results
$108,160 est. value
Mattoon, IL

1,250 Ton Hot-Mix Asphalt Surface Course FOB at Plant
Infrastructure
Post-Bid
Mattoon, IL

Bituminous Materials
Term Contract
Results
Charleston, IL

18.7 Miles of Patching and a-2 Surface Treatment on Various Routes in Clay
Infrastructure
Results

1.3 Miles of Smart Inlay Under Overhead Structures
Infrastructure
Results

11.6 Miles of Seal Coat
Infrastructure
Results

Last Updated 03/12/2022 05:10 AM
Project Title

Placing 8.3 Miles of Aggregate Shoulders on US 45 from the Douglas County line to Donnelly Road

Physical Address View project details and contacts
City, State (County) IL   (Coles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Placing 8.3 miles of aggregate shoulders on US 45 from the Douglas County line to Donnelly Road. Pay Item # Uom Description Type Quantity Unit Price 48101200 Ton Aggregate Shoulders, Type b Base Items 4,296.000 67100100 l Sum Mobilization Base Items 1.000 70100460 l Sum Traffic Control And Protection, Standard 701306 Base Items 1.000 70107025 Cal Da Changeable Message Sign Base Items 28.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents