Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$630,000 est. value
WA

Alki Permanent Standby Generator
Alteration
Design
$6,000,000 est. value
WA

Marshalling Yard Electrification
Alteration
Bidding
$125,000 est. value
Seattle, WA 98118

Electrical Systems Maintenance - Citys Movable Bridges
Alteration
Bidding
Seattle, WA

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Electrical Construction Work Order 2021-2022
Term Contract, Alteration
Post-Bid
WA

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Seattle International Airport Main Terminal Low Voltage Upgrade - Bid Packages - 002
Alteration
Bidding
$30,000 est. value
Seatac, WA 98188

Auxiliary Utility Facility Generator Maintenance
Alteration
Post-Bid
Seattle, WA

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Central OMF Power Transformer Replacement
Alteration
Bidding
$634,864 to $793,570 est. value
Seattle, WA 98134

Fire Alarm and Electrical Power Improvements at Franklin High School Gym Building
Alteration
Post-Bid
Seattle, WA 98144

Lake City Land Banked Site Park
Demolition, Infrastructure, Alteration
Results
Seattle, WA 98125

Seattle-Tacoma International Airport Main Terminal Low Voltage Upgrade - Bid Package 002 - Select Demo, Carpentry, Specialties
Alteration
Bidding
$30,000,000 est. value
Seatac, WA 98158

Last Updated 05/23/2022 02:21 AM
Project Title

Rebid - Chrl Leachate Pump Stations 1A Electrical, 2 And 3 Upgrade

Physical Address View project details and contacts
City, State (County) WA   (King County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,945,000 to $2,145,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: Construct a new booster pump station including site work, site piping, new CMU building containing separate pump, chemical and generator rooms, skid mounted pump system, diesel generator and fuel storage, HVAC system, electrical power, control, and instrumentation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents