Similar Projects
Water System Improvements - Contract 5 - West Lydius Connection
Post-Bid
Less than $950,000 est. value
Guilderland, NY 12084

Pipe, Fittings and Hydrants LWD 2019
Post-Bid
Newtonville, NY

Albany / Colonie Interconnection Project
Results
Less than $1,100,000 est. value
Latham, NY

Water Distribution System Improvement Phase 3
Results
Watervliet, NY

Albany-Shaker Road Cured-In-Place Pipe Rehabilitation Project
Post-Bid
Latham, NY 12110

Purchase of Waterous Fire Hydrants
Results
Albany, NY

Bay Park Conveyance
Term Contract
Post-Bid
NY

Woodlawn Park Water Re-Use Project
Results
Albany, NY 12207

Water Meters
Term Contract
Post-Bid
Delmar, NY 12054

Lead Service Line Replacement Project
Results
Albany, NY 12207

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

Devil`s Tombstone Campground Water and Electrical Improvements
Term Contract
Results
$395,000 to $430,000 est. value
Albany, NY 12233

Water System Replacement
Post-Bid
Less than $500,000 est. value
Watervliet, NY 12189

Water Connection to Building for Fire Sprinkler System Hook Up at Commut Air (Building 211) at Albany International Airport.
Results
Albany, NY 12211

Purchase of Hymax Couplings
Post-Bid
Albany, NY 12207

Last Updated 01/03/2019 03:40 PM
Project Title

Repair Vickers Servo Valves

Physical Address View project details and contacts
City, State (County) Watervliet, NY 12189   (Albany County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. The contractor shall inspect the lot of two valves (Model # SA4-03-35-004-15) and provide a list of task to be performed, materials by part number to be replaced. 2. The cost for repair shall not exceed 70% of the cost of a new valve. 3. The contractor shall provide an exterior inspection, looking for damage and leaking. 4. Servo valves will be disassembled and pre-testing of key components like control and power wiring, current/flow, coil independence, motor, and ball weld, etc. parts required for repair as recorded. 5. All new seals & filters ultrasonically are replaced every time. 6. The motors are calibrated every time. 7. All new parts will be provided by the contractor, unless written approval is granted on a case by case basis. 8. Servo valve is cleaned and all required parts are installed. 9. Test each servo valve to OEM specifications. 10. After the valve has passed the testing procedure, package with a service report, test report, Certificate of Conformance, and a one (1) year Warranty of parts and labor. Servo Valve is to be electrostatically packaged and returned.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents