Similar Projects
Design Build Renovations/Construction at Warner Robins Fire Station 3
Renovation - 2,550 SF
Bidding
$700,000 est. value
Warner Robins, GA 31088

Parking and Exterior Enhancements LaGrange Police Department
Renovation
Bidding
LaGrange, GA 30240

Inspections, Maintenance, Service, Repair and Reports for the Fire Training Tower at Fort Gordon, GA.
Post-Bid
Fort Gordon, GA

West Jackson Fire Station No 2
New Construction
Post-Bid
Less than $1,300,000 est. value
Braselton, GA

Bathroom Renovation at Fire Station 23
Renovation
Results
Powder Springs, GA 30127

Renovation of New Public Safety Facility
Renovation, Addition - 7,500 SF
Results
Dahlonega, GA 30533

Construction Manager at Risk Services for Fire Station #3
Construction
Cartersville, GA

Construction of New Fire Station 2
New Construction
Construction
$2,997,577 est. value
Augusta, GA

Cumberland Mall Redevelopment
New Construction - 476,200 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, Smyrna, GA 30339

Savannah Regional Police Academy Expansion
Addition - 7,442 SF
Post-Bid
Savannah, GA

Clay County Fire Station 1 and Emergency Services
Renovation
Results
GA

Construction of New Fire Station 20
New Construction
Construction
Hephzibah, GA 30815

Key Hose for the Forsyth County Fire Department
Post-Bid
Cumming, GA 30040

Paulding County Fire Station 12
New Construction - 4,059 SF
Results
Less than $1,539,707 est. value
Dallas, GA 30132

Design-Build Fire Station No. 8 - Gum Creek Road
New Construction
Construction
Less than $1,600,000 est. value
Covington, GA 30014

Last Updated 08/24/2021 04:56 PM
Project Title

Aircraft Rescue Firefighting Facility Renovation

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30336   (Fulton County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,486,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Selective Demolition: There will be some limited demolition to the existing structure to allow for the new renovation and additions. The demolition generally consists of removal of all the exterior windows and doors, partial demolition of existing load-bearing walls and exterior walls and the removal of the roof structure over the apparatus bays of the lower level. Renovation: The entire upper floor will be renovated and portion of the lower level will require construction as part of the new work on the upper level. New additions will beconstructed over the existing lower level.

Details

Fire/Police Station, 6,403 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents