Similar Projects
Hawthorn MS North Boiler Replacement
Bidding
Vernon Hills, IL 60061

Fairmount ES Mechanical Upgrades
Bidding
Downers Grove, IL 60516

East Moline Correctional Center Boiler Acid Wash
Post-Bid
East Moline, IL 61244

Boiler and Hot Water Heater Maintenance
Term Contract
Post-Bid
Downers Grove, IL

Niles West Domestic Water Heater Replacement
Renovation
Results
Skokie, IL 60077

Building B Boiler Replacement Service
Results
Crystal Lake, IL 60012

2021 Fire Alarm System, Boiler Upgrades and Freezer Replacement
Bidding
Loves Park, Machesney Park, IL 61115

Abandoned Rooftop Equipment Removal
Post-Bid
Palatine, IL 60067

Water Heater Replacement
Results
Deerfield, IL 60015

FDC Mechanical Systems/Envelope Upgrades
Bidding
University Park, IL

Repair Boilers
Post-Bid
$100,000 to $250,000 est. value
IL

Water Treatment Plant Boiler Replacement
Results
Hudson, IL 61748

Fenton HS Ionization Existing Mechanical Equipment
Bidding
Bensenville, IL 60106

DHS/Elgin MHC Refrigeration
Term Contract
Post-Bid
Elgin, IL 60123

Boiler Replacement at Dawes Elementary School Annex Building and Washington Elementary School Annex Building
Results
Evanston, IL 60202

Last Updated 09/14/2020 05:51 PM
Project Title

Decatur Correctional Center Replace Boiler Burners

Physical Address View project details and contacts
City, State (County) Decatur, IL 62524   (Macon County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work is to complete the asbestos abatement of the remaining systems in the mechanical room. In addition, replace three 350 horsepower low pressure steam boilers, replace 9 steam isolation valves in the main steam header, replace the primary and bypass steam control valves, replace the two boiler feedwater pumps, replace the condensate receiver tank, provide a means for continuous domestic hot water, attempt to maintain one operational boiler (or at least minimize downtime) at all times. New equipment will be integrated into the existing Carrier building control system. Existing electrical disconnect switches at each boiler shall be removed and replaced. New wiring will be connected from the new disconnect switches to the new boilers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, Facility Fuel Piping, Facility Natural-Gas Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping Specialties, HVAC Water Treatment, HVAC Air Distribution, Breechings, Chimneys, and Stacks, Heating Boilers, Fire-Tube Boilers, Heating Boiler Feedwater Equipment, Central HVAC Equipment.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents