Similar Projects
O'Reilly Auto Parts (OH1) / Olivehurst
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Olivehurst, CA 95961

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Paint Bridge Walls, Reconstruct and Extend Sidewalks, Paint Concrete Pedestrian Bridge
Infrastructure
Design
$561,000 CJ est. value
Marysville, CA 95901

North Yuba Water District Water Storage Improvements Project.
Infrastructure
Bidding
$698,000 CJ est. value
Brownsville, CA 95919

Asphalt Repair
Infrastructure
Post-Bid
$150,000 to $180,000 est. value
Marysville, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Widen Shoulders and Improve Clear Recovery Zone
Infrastructure
Results
$86,000,000 est. value
CA

5th Street Rehabilitation
Infrastructure
Results
$2,697,550 est. value
Marysville, CA

River Oaks Family Apartments Phase 2
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Plumas Lake, CA 95961

Beale Fuel Hydrant Replacement
Infrastructure, Renovation
Post-Bid
$100,000,000 CJ est. value
Beale AFB, CA 95903

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

AutoZone #5722 / Marysville
New Construction, Infrastructure - 3,800 SF
Design
$1,500,000 CJ est. value
Marysville, CA 95901

ARW Squad Ops and AMU Complex- Beale AFB
New Construction, Infrastructure - 49,112 SF
Post-Bid
$50,000,000 CJ est. value
Beale AFB, CA 95903

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Last Updated 02/10/2023 03:04 AM
Project Title

Rehabilitate Pavement, Add Bike Lanes, Rehabilitate Drainage Systems, Upgrade Facilities to ADA Standards

Physical Address View project details and contacts
City, State (County) Olivehurst, CA 95961   (Yuba County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $9,087,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate Pavement, Add Bike Lanes, Rehabilitate Drainage Systems, Upgrade Facilities to ADA Standards, and Construct Class I Multi-use Path, Modify Driveways, and Enhance Crosswalk Visibility as Complete Streets Elements. Project ID : 0315000151 Bkpm: 0.5 Ahpm : 1.8 Proposed Advertise Date : 02/27/2023 As of February 10, 2023, the project is in Final Planning status. Anticipated construction year is 2023. CADOT - Rehabilitate Pavement, Add Bike Lanes, Rehabilitate Drainage Systems, Upgrade Facilities to ADA Standards *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents