Similar Projects
Movement School East
Addition
Conception
Charlotte, NC 28212

Hope Montessori School
New Construction - 2,382 SF
Conception
$500,000 to $1,000,000 CJ est. value
Matthews, NC 28104

York Elementary
Design
NC

Telra Institute Charter School
New Construction
Design
Charlotte, NC 28270

Bond Project Renovations Pleasant Grove Elementary School
Renovation - 49,999 SF
Bidding
Burlington, NC

2021-C Construction Manager at Risk Selection (Two New Elementary Schools)
Renovation
Bidding
Cary, NC

Renovation of the Existing Brassfield Elementary School and E24 Barton Pond Elementary School
Renovation - 69,525 SF
Sub-Bidding
Raleigh, NC 27616

New Erwin Elementary School
New Construction - 102,500 SF
Post-Bid
Erwin, NC 28339

E-41 Apex Friendship Elementary School
New Construction - 129,790 SF
Post-Bid
Apex, NC 27502

CM at Risk Selection - Two New Elementary Schools, One New High School, and One Middle School Renovation/Replacement
Renovation
Results
NC

Claremont Elementary Alterations to Old Kitchen/Cafeteria
Renovation
Results
Claremont, NC 28610

Crosscreek Charter School
New Construction - 39,000 SF
Construction
$5,955,000 est. value
Louisburg, NC

Thales Academy at Chatham Park
New Construction - 54,284 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Pittsboro, NC 27312

Valle Crucis School
New Construction
Pending Verification
Sugar Grove, NC 28679

Existing Pine Valley Elementary Renovation
Renovation
Conception
Wilmington, NC 28412

Reported 07/20/2021 10:48 AM
Project Title

Lebanon, Bain, Piney Grove Relief Elementary

Physical Address View project details and contacts
City, State (County) Matthews, NC 28105   (Mecklenburg County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Commenced May 2021
Bids Due View project details and contacts
Estimated Value $31,455,951
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CMS Lebanon, Bain, Piney Grove Relief Elementary School is two-story steel and masonry construction. The School is about 102,740 sqft building with multi color unit masonry and structural masonry. Exterior of the building also includes storefronts, metal windows, curtainwalls, metal panels and soffit panels with TPO roofing. School will provide multiple classrooms, individual bathrooms for some of the classrooms, tutoring rooms, dining room, school kitchen, staff offices, library/media room, multipurpose room with sports equipment and theater equipment. Interior finishes of school will consist of VCT, carpet tile, Acoustical Ceiling Tiles, Acoustical Wall Panels, Painting, Gypsum board walls and ceiling, interior folding partition wall, ceramic tiles, LED lightings, etc.

Details

Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents