Similar Projects
Norton Creek Flood Control - 603-60-22524 - City of Fridley
Infrastructure
Conception
$900,000 CJ est. value
Fridley, MN 55432

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

Midtown Greenway Apartments
New Construction
Design
Minneapolis, MN 55407

Landmark Dinkytown
New Construction, Demolition
Design
Minneapolis, MN

Kellys Sample Pool Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Anoka, MN 55303

CSAH 83 & Alpine Drive
Infrastructure
Bidding
$250,000 CJ est. value
Ramsey, MN 55303

Central Avenue Sewer Manhole Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Columbia Heights, MN 55421

2022 East Shadow Lake Drive Utility Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Lino Lakes, MN 55014

Siwek Park Improvements
Renovation, Infrastructure
Results
$375,000 est. value
Saint Francis, MN

ISD 11 High School Multipurpose Fields
New Construction, Infrastructure
Results
Anoka, MN

Portland And Washington Mixed Use
New Construction - 15,000 SF
Construction
Minneapolis, MN 55415

Eide Saw Mixed Use Building
New Construction - 8,222 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Minneapolis, MN 55413

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Rural Reserve Trunk Sanitary Sewer - 24-48200-01 - City of Andover
Renovation, Infrastructure
Conception
$3,800,000 CJ est. value
Andover, MN 55304

Last Updated 02/08/2023 01:36 PM
Project Title

Coon Rapids - Hornig

Physical Address View project details and contacts
City, State (County) Coon Rapids, MN 55433   (Anoka County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The apartment building is 43 units. The structure of the building is 1 level precast with 4 levels of wood framing. (1 underground / 4 above ground) If you have any questions or need clarifications to the project documents please contact Brad Buche (brad.buche@big-d.com) (651-728-4768) As of February 8, 2023, construction began in November 2022 and construction completion is scheduled for November 2023.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents