Similar Projects
Telescopic Seating
Renovation
Bidding
Benton, IL

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Disaster Recovery Services
Results

Disaster Recovery Services
Results

HVAC and Mechanical Products
Term Contract
Post-Bid

Interior Renovations
Results
Less than $120,000 est. value
Akin, IL

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Central Junior High HVAC Replacement - Phase 2
Results
Less than $1,200,000 est. value
West Frankfort, IL 62896

Weatherization (IHWAP) Program
Term Contract
Post-Bid

Zeigler-Royalton High School Restrooms
Renovation
Results
Mulkeytown, IL 62865

HVAC Replacement Work at Sesser-Valier K-12 School
Alteration
Post-Bid
Sesser, IL

Franklin County Jail HVAC Upgrades
Alteration
Results
$300,000 to $400,000 est. value
Benton, IL 62812

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Central JHS Parking Lot Replacement
Renovation, Infrastructure
Results
West Frankfort, IL 62896

Last Updated 02/09/2022 10:04 AM
Project Title

HVAC Replacement

Physical Address View project details and contacts
City, State (County) Mulkeytown, IL 62865   (Franklin County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, HVAC, Mechanical, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to include the removal of two existing rooftop multi-zone units, one horizontal discharge unit, interior ductwork modifications, removal of all interior ACT ceiling assemblies, modifications to existing roof mounted exhaust fans, flues, and other related items at the elementary and high schools. New work to include the installation of new roof curbs, curb adapters, two VAV roof top units, one horizontal discharge unit, exterior ductwork and jacketing, interior ductwork, gas service and piping at the elementary, gas piping and electrical modifications at the high school, ACT ceiling assemblies, and light fixture and fire alarm device re-installation. Corresponding Mechanical, Plumbing, and Electrical Systems will also be included.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents