Similar Projects
Large Culvert Replacement
Infrastructure
Bidding
Brunswick, ME 04011

Two Bartlett Brook Stream Crossing Upgrades
Results
Naples, ME

Underwood Road Drainage System Improvements
Results
Less than $500,000 est. value
Falmouth, ME

Back Cove West Storage Conduit
Results
Portland, ME

Shaker Road Sidewalk and Drainage Improvements Project
Results
Gray, ME 04039

Drainage Improvements
Results
Sebago, ME

Meetinghouse Hill Improvements
Results
South Portland, ME

Poland Range Road Culvert Replacement
Results
Pownal, ME 04069

Lantern Lane Culvert Replacement Project
Results
Windham, ME 04062

Retaining Wall Replacement and Fence Project along Yellowbird Road
Results
Less than $290,000 est. value
Portland, ME 04102

Talbot School Basketball Court Reconstruction and Culvert Replacement Project
Renovation, Infrastructure
Results
Less than $134,000 est. value
Portland, ME

Large Culvert Replacement
Infrastructure
Results
ME

Water Line and Utility Vaults MM 47.1, MM 47.6, and MM 48.5
Infrastructure
Results
Less than $1,000,000 est. value
Portland, ME

Construction Services for Phillips Brook Stream Restoration
Infrastructure
Results
Scarborough, ME

Mast Road Culvert Replacement
Infrastructure
Results
Falmouth, ME 04105

Reported 03/11/2022 12:00 AM
Project Title

Plummer Road Large Culvert Replacement

Physical Address View project details and contacts
City, State (County) Gorham, ME 04357   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 02/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: Replacement of an existing deteriorating culvert with a 19’ Span X 8’ Rise X 70’ Length Precast Concrete Box Culvert with a simulated streambed material in order to allow for sufficient fish passage through this crossing. The installation of this culvert will include; excavation, instillation of culvert and related backfill, gravels, base and surface pavements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents