Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Pueblo Cannabis
Renovation, Infrastructure - 3,400 SF
Design
$150,000 est. value
Coachella, CA 92236

AutoZone #5327 / Murrieta
New Construction, Infrastructure - 6,500 SF
Bidding
$1,500,000 CJ est. value
Murrieta, CA 92563

FTU Site Improvements
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
March Air Reserve Base, CA 92518

I-15 and SR 76, 78, 79, and 371 Middle-Mile Broadband Network
Infrastructure
Sub-Bidding
$75,000,000 CJ est. value
Riverside, CA 92522

Tract 32408 Street Improvements
Infrastructure
Sub-Bidding
$1,570,142 CJ est. value
Moreno Valley, CA 92557

ADA Improvement Project 31540-42 Railroad Canyon Road
Alteration
Post-Bid
Canyon Lake, CA 92587

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

52nd Avenue Resurfacing Monroe Street to Van Buren Street Project No. D0-0065 and Calhoun Street Reconstruction 54th Avenue to 0.12 Miles North of 52nd Avenue Project No. C9-0012
Infrastructure
Results
$1,390,000 to $1,620,000 est. value
Riverside, CA 92519

McCall Boulevard Resurfacing
Infrastructure
Results
Menifee, CA 92584

Inland Valley Medical Center Patient Tower
New Construction, Infrastructure - 290,000 SF
Pending Verification
$170,000,000 CJ est. value
Wildomar, CA 92595

Cotino, A Storyliving by Disney Community
New Construction, Infrastructure
Pending Verification
$800,000,000 CJ est. value
Rancho Mirage, CA 92270

Improvement of Bike Network Connectivity/ATP Trails
Infrastructure
Design
$7,220,000 est. value
Corona, CA 92880

D Street Concrete Paver Repair and Sidewalk Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Perris, CA 92570

Construction of House Demoltion Project
Demolition, Infrastructure
Sub-Bidding
$150,000 CJ est. value
Riverside, CA 92506

Last Updated 08/04/2022 12:34 AM
Project Title

Norco MDP Lateral N-1G Storm Drain Project

Physical Address View project details and contacts
City, State (County) Norco, CA 92860   (Riverside County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $826,685 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of approximately 485 linear feet of varying size RCP storm drain pipe along with lateral pipes, manholes, and catch basins. The storm drain will be located within California Avenue and will be connected to the MDP Line N-1 storm drain. The project also includes street improvements on California Ave including curb and gutter, driveways, and asphalt work. There are 60 working days allowed to complete this project, including any and all alternatives. Liquidated damages shall be assessed at $500.00 per working day. Any Contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages, apprenticeship employment standards, and Contractor registration program established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will be also required. The Contract Documents call for monthly progress payments based upon the engineers estimate of the items of work completed. The AGENCY will retain 5 percent of each progress payment as security for completion of the balance of the work. At the request and expense of the successful Bidder, the City of Norco will pay the amounts so retained upon compliance with the requirements of Government Code Section 4590 and the provisions of the Contract Documents pertaining to Substitution of Securities. For each consecutive working day in excess of the time specified, as adjusted in accordance with Subsection 6-6, for completion of the work the Contractor shall pay to the Agency, or have withheld from monies due it, the sum of $500.00.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents