Similar Projects
Detention Services and Equipment Upgrades - Lee CI - Fire Alarm Replacement
Alteration
Bidding
$1,900,000 to $2,200,000 est. value
Bishopville, SC 29010

Inspection, Testing and Repair Service for Fire Protection Systems
Alteration
Bidding
Conway, SC 29526

Fire Alarm Testing and Inspection Services
Term Contract
Post-Bid
Lancaster, SC 29720

VVH Grounding and Surge Protection Upgrade
Post-Bid
$120,000 to $165,000 est. value
Walterboro, SC 29488

Coastal Center - Kitchen and Warehouse - New Fire Alarm System
Results
Less than $25,000 est. value
Summerville, SC 29485

Fire Alarm Inspection, Testing, and Maintenance
Results
Charleston, SC 29404

Fire Suppression Inspection, Maintenance and Repair
Alteration
Bidding
Charleston, SC

Fire Extinguisher Purchase and Maintenance
Term Contract
Post-Bid
Columbia, SC

Expression of Interest to Design and Engineer Halon Fire Suppression Systems with FK-5-1-12 Clean Agent Fire Suppression Systems at the Savannah River Site- Located near Aiken, SC
Results
Aiken, SC

Pendleton Elementary School Fire Alarm Upgrade
Alteration
Bidding
Pendleton, SC 29670

Fire Sprinkler & Back Flow Services
Post-Bid
West Columbia, SC 29170

Fire Pump and Sprinkler Inspection
Results
Columbia, SC 29201

Installation Of Fire Protection Systems For Four (4) Fire Stations
Alteration
Bidding
Spartanburg, SC

Fire Extinguisher Inspection and Service
Term Contract
Post-Bid
Rock Hill, SC 29731

1206 Flora Street Mill Renovation - Fire Sprinkler
Results
$328,460 est. value
Columbia, SC 29208

Reported 10/22/2021 01:36 PM
Project Title

Replace Fire Suppression System

Physical Address View project details and contacts
City, State (County) Salters, SC   (Williamsburg County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rear dock of facilities: Approximately 700` of main line with 62 legs(10-12 feet) with double sprinkler heads on all legs with the exception of one. Warehouse Dock: Approximately 350` of main line with 15 legs(10-12 feet) with double sprinkler heads on each leg Shower banks: approximately 30` long each with two legs, 1 sprinkler head per leg. Shower banks will be changed from the ceiling pendant to a wall pendant. Nitrogen System installed on both dry systems The fire suppression system is required to be operational and charged back at the end of each day.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents