Similar Projects
18TH Avenue North Ocean Outfall
Infrastructure
Bidding
North Myrtle Beach, SC

Cooper River Marina Transient Dock Repairs
Infrastructure
Bidding
North Charleston, SC 29405

Charleston - Santee Coastal Reserve Dock Replacement
Post-Bid
$250,000 to $350,000 est. value
McClellanville, SC 29458

State Park Piers Repair - Hunting Island
Post-Bid
$750,000 to $1,000,000 est. value
Saint Helena Island, SC 29920

Surfside Beach Fishing Pier Restoration Project
Results
Surfside Beach, SC 29575

Marine Contractors for the Construction of the Battery Park Pedestrian Bridge
Results
North Charleston, SC 29406

Cherry Gove Barge Landing, Bulkhead and Excavation 2022
Infrastructure
Bidding
North Myrtle Beach, SC

Furnish and Install A Dock at Pack's Landing
Post-Bid
Rimini, SC

TC Dock Repair
Results
Charleston, SC 29404

Underwater Piling Installation
Post-Bid
$25,000 to $100,000 est. value
Eastover, SC

Green Pond Landing Weigh-in-Dock Project
Results
Less than $500,000 est. value
Anderson, SC

Saluda Shoals Front Bridge and Over Look Repair
Post-Bid
$22,000 est. value
Columbia, SC 29212

Chehaw Pier Replacement
Results
Walterboro, SC

Train Depot Deck Repair
Post-Bid
York, SC 29745

Loading Dock Levelers Final 1
Results
Rock Hill, SC 29732

Reported 03/30/2022 12:00 AM
Project Title

Design-Build Charleston Pier Papa Recapitalization, USCG Base Charleston, Charleston SC

Physical Address View project details and contacts
City, State (County) North Charleston, SC   (Berkeley County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Design-Build. Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $90,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will construct new waterfront, shore structures and utility/supporting facilities required to homeport and berth 4 NSCs at Pier November (4 dedicated berths at Pier November). The scope of work includes, but is not limited to: demolition and replacement of the existing Pier November and of damaged bulkhead, removal and backfill of contaminated soils and removal of uncontaminated underwater released aggregate. Dredging will include spoils from between Piers Mike and Papa for constructing the new Pier November as well as the removal 3 pieces of submerged equipment in the area of the collapsed bulkhead. The construction includes a new Pier November, support facilities, site/groundwork and all associated utilities. New Shore Tie service requirements for electrical, potable water, fire protection, sewer, bilge water, and compressed air services will be provided for 5 NSCs at Pier November and bulkhead mooring. In addition, a new duct bank will be installed to provide C5IT connectivity between pier Papa and Pier Mike. The new work for this project will also involve additional paving of the ground surface to provide an access road to Pier November. All future parking, buoy storage, and MAT Cutter Support Team (CST) requirements will be addressed by an on-going IDP/Master Plan. Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents