Similar Projects
Phil Welch Stadium Grandstand Concrete - 250670 - City of Saint Joseph
Renovation, Infrastructure
Conception
Less than $400,000 est. value
Saint Joseph, MO 64503

Concrete Block Work in Cell Addition
Renovation
Design
$375,000 CJ est. value
Ava, MO 65608

Concrete Maintenance and Repair
Term Contract
Design
Blue Springs, MO 64015

Clark Hall - First Floor Renovation and South Entrance Creation
Infrastructure, Renovation - 15,000 SF
Bidding
$4,109,397 CJ est. value
Columbia, MO 65203

New FMDC Grounds & Maintenance Building
Infrastructure
Bidding
$1,000,000 CJ est. value
Jefferson City, MO 65101

Refinish Concrete Lab Floors at Main Science Labs
Renovation
Sub-Bidding
$160,000 CJ est. value
Cottleville, MO 63376

Shelby County R-IV School District - Restroom Renovation
Renovation
Sub-Bidding
$70,000 CJ est. value
Shelbina, MO 63468

Concrete (Ready-Mix) Annual Price Agreement 2022-2023
Alteration
Post-Bid
Sikeston, MO

2022 Concrete Pad Replacement
Alteration
Post-Bid
Festus, MO

Grandview Meter Station Concrete Coating
Alteration
Results
MO

Ready Mix Concrete
Alteration
Results
Springfield, MO 65803

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

2022 Hazelwood Asphalt Improvements Project
Infrastructure
Construction
$320,000 CJ est. value
Hazelwood, MO 63042

Park Restroom Conversion Conway & Malcom Terrace Park
Renovation - 230 SF
Bidding
$200,000 CJ est. value
Creve Coeur, MO 63141

Asphalt and Concrete Repair and Replacement Services
Infrastructure, Alteration
Post-Bid
Liberty, MO

Last Updated 06/13/2023 06:06 AM
Project Title

2 Bridge Replacements and Intersection Improvements

Physical Address View project details and contacts
City, State (County) Harrisonville, MO 64701   (Cass County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $10,985,677 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J4P3443 Route 7 Cass County. 2 Bridge replacements and intersection improvements on Rte. 7 (275th Street) over I-49, the total length of improvement being 0.258 miles. Range: $7.5M to $10M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and Through the Missouri highways and transportation commission", as Obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. MO DOT - C04 - 2 Bridge Replacements and Intersection Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents