Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Asbestos Abatement - Federal Correctional Institution (FCI) Sandstone
Term Contract, Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Sandstone, MN 55072

Excavation, Removal and Disposal of Old Culverts, and Excavation and Clean Ditches
Infrastructure
Bidding
$300,000 CJ est. value
Willow River, MN 55795

Staff Housing Fence Removal and Installation - Federal Correctional Institution (FCI) Sandstone
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Sandstone, MN 55072

D3 Head Start Fence Lake Lena
Infrastructure
Sub-Bidding
$20,000 CJ est. value
Sandstone, MN 55072

Park Forest Road East Graveling and Culvert Replacement
Post-Bid
MN 55712

North Smoky Hills Graveling
Renovation
Post-Bid

Pipe and Culvert
Results
$122,673 est. value
MN

2021 Pavement Rehabilitation
Results
$180,000 est. value
Pine City, MN

Winter Snow Removal and Sanding Services
Term Contract
Sub-Bidding
Willow River, MN 55795

Sandstone Road Mowing - Rebid
Term Contract
Post-Bid
Sandstone, MN

District Wide Bituminous Seal Coat
Results

2022-2023 Plowing and Snow Removal Bid
Term Contract
Sub-Bidding
Sturgeon Lake, MN 55783

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Grading, Full Depth Reclamation, Mill and Bituminous Surfacing, Lighting, and ADA Improvements 3.883 Miles
Results
MN

Last Updated 08/08/2022 01:33 PM
Project Title

Banning State Park Entrance Road Rehabilitation

Physical Address View project details and contacts
City, State (County) Sandstone, MN 55072   (Pine County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

SPK00103.00.00.06/8P486 All questions should be submitted no later than: August 4, 2022 at 2:00 PM. The State is not obliged to answer questions submitted after the question due date and time. A. The work will be done under one prime contract that includes: General Construction B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Reclaim approx. 8,040 SY existing bituminous entrance road to park. 2. Replace two culverts. 3. Furnish and place approx. 1,665 ton bituminous pavement. Est. Completion Date: Oct. 7, 2022 Pre-Bid Meeting Info: No Pre-Bid Meeting The contractor's completed bid worksheet will be incorporated into the final contract.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents