Similar Projects
Wallington Pumping Station Rehabilitation Project
Renovation
Bidding
Wallington, NJ

Raw Water Pump Station Modifications to HVAC, Roof and Hatch Installation
Infrastructure
Bidding
Brick, NJ

Water Pollution Control Facility Effluent Pump Station Upgrades
Post-Bid
Livingston, NJ

Sanitary Sewer Pump Station Improvements
Post-Bid
Scotch Plains, NJ 07076

Upper Manasquan Pump Station Raw Sewage Pump Rebuilding
Results
Howell, NJ

Homestead Sewage Pump Station Upgrades
Results
$248,677 est. value
Woodbridge, NJ 07095

Yardville/Groveville Pump Station Upgrades
Infrastructure
Bidding
Hamilton, NJ

Rehabilitation Of Roosevelt Avenue Pump Station
Post-Bid
Carteret, NJ 07008

Pump Station 5 Upgrade
Results
Old Tappan, NJ 07675

Newark Meadowland Pump Station Slide Gate Replacement
Alteration
Bidding
Newark, NJ

Diamond Drive Pump Station Rehabilitation
Post-Bid
Waretown, NJ 08758

Clay Street Pump Station Rehabilitation
Results
Riverside, NJ 08075

Sediment Removal Manasquan Reservoir Water Supply System Intake Pump Station
Renovation
Bidding
Allenwood, NJ 08720

2020 Proposal Influent Grinders for Wastewater Stations
Term Contract
Post-Bid
Somers Point, NJ 08244

Communitor Sewage Grinder for Pump Stations
Results
Forked River, NJ 08731

Last Updated 06/07/2021 02:14 PM
Project Title

Pump Station Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Cape May Court House, NJ 08210   (Cape May County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Construction of improvements and repairs to 617 Stone Harbor Boulevard Pump Station, 736 Stone Harbor Boulevard Pump Station, 750 Stone Harbor Boulevard Pump Station and Roosevelt Boulevard Pump Station (4-total) within the Township of Middle, New Jersey.The work for the 617, 736, and 750 Stone Harbor Boulevard Pump Stations will require demolition, including but not limited to, implementation of bypass pumping operations, excavation, removal and off-site disposal of existing subgrade concrete vaults, discharge piping, valves and appurtenances, pumps, limited removal of existing force main and demolition of electrical equipment noted on the Contract Drawings. Following completion of demolition, the work will also include construction of new pump station valve/meter chamber, installation of new wet well riser sections and top slabs, installation of new epoxy coating system within wet well, installation of new submersible sewage pump and associated discharge piping and appurtenances, process piping, valves, magnetic flow meters and fittings, miscellaneous metals and platforms, construction of new electrical work including power distribution, controls and standby generator systems, site work including site and access clearing, and driveway construction, landscaping, new site security fencing, and site restoration, all as shown on the drawings and specified herein. The work at the Roosevelt Boulevard Pump Station will require demolition, including but not limited to, implementation of bypass pumping operations, excavation, removal and off-site disposal of existing pumps, discharge piping, valves and appurtenances, limited removal of existing force main and demolition of electrical equipment noted on the Contract Drawings. Following completion of demolition, the work will also include installation of new submersible pumps and associated discharge piping and appurtenances, process piping, valves, magnetic flow meter and valve/meter chamber, installation of new epoxy coating system within wet well, miscellaneous metals and platforms, construction of new electrical work including new power distribution and controls site work including site and access clearing, and driveway construction, landscaping, new site security fencing, and site restoration

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents