Similar Projects
MBWWTP (Moccasin Bend Wastewater Treatment Plant) Oxygen Plant Replacement - City Of Chattanooga
Renovation
Conception
$22,300,000 CJ est. value
Chattanooga, TN 37405

Brush Creek WWTP Aeration - City of Johnson City
Renovation
Conception
$1,500,000 CJ est. value
Johnson City, TN 37601

Building Modifications at the Pigeon Forge Wastewater Treatment Plant
Renovation
Design
Pigeon Forge, TN 37863

NWCX Waste Water System Repairs
Renovation, Infrastructure
Design
$2,200,000 CJ est. value
Tiptonville, TN 38079

Gladeville Water Treatment Plant - Carbon Feed Building Addition
Addition, Demolition, Infrastructure
Bidding
$900,000 CJ est. value
Lebanon, TN 37090

WWTP Phase 1 Improvements
Infrastructure
Bidding
$15,000,000 CJ est. value
Mount Carmel, TN 37645

Henning Wastewater System Improvements
New Construction
Post-Bid
Henning, TN

Wastewater System Closure NECX-CCX
Renovation
Post-Bid
Roan Mountain, TN 37687

McCroskey Island Wastewater Treatment Plant Improvements
New Construction
Results
$1,500,000 est. value
Sevierville, TN 37876

Moccasin Bend Wastewater Treatment Plant Improvements
Results
Chattanooga, TN 37405

New Public Services Admin Building - City of White House
New Construction, Infrastructure
Conception
$400,000 CJ est. value
White House, TN 37188

David Crockett Birthplace State Park WWTP Renovations
Renovation, Infrastructure
Design
$3,990,000 CJ est. value
Limestone, TN 37681

Wastewater Treatment Plant Ultraviolet Disinfection Improvements
Renovation, Infrastructure
Bidding
$250,000 CJ est. value
La Vergne, TN 37086

Wastewater Treatment Testing at Bledsoe County Correctional Complex
Term Contract
Post-Bid
Nashville, Pikeville, TN 37367

Miller Avenue - WWTP Clarifier Replacement
Alteration
Results
Jackson, TN 38305

Last Updated 04/10/2023 07:33 PM
Project Title

Water System Improvements - Water Treatment Plant - High Service Pump Replacement

Physical Address View project details and contacts
City, State (County) Oliver Springs, TN 37840   (Roane County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $116,860 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Water System Improvements - Water Treatment Plant - High Service Pump Replacement

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents