Similar Projects
Mayflower Mill ES Additions, Renovations and Related Work
Renovation
Bidding
Lafayette, IN 47909

Mayflower Mill Elementary School Addition, Renovation, and Related Work
Renovation, Addition
Bidding
$12,000,000 est. value
Lafayette, IN 47909

New Klondike Middle School
New Construction
Post-Bid
Less than $130,000,000 est. value
West Lafayette, IN

Main Floor Modifications Phase II Harrison High School
Results
Less than $3,000,000 est. value
West Lafayette, IN 47906

James Cole Elementary School Interior
Renovation - 83,025 SF
Results
Lafayette, IN 47909

East Tipp Middle School
Renovation
Results
Lafayette, IN 47905

Restroom Pods
Renovation
Results
West Lafayette, IN 47906

McCutcheon HS Auxiliary Gym
Renovation
Results
Less than $250,000 est. value
Lafayette, IN 47909

William Henry Harrison HS Auditorium
Renovation
Results
West Lafayette, IN 47906

Dayton ES Gymnasium Canopy Replacement
Renovation
Results
Dayton, IN 47941

Wainwright Middle School Cafeteria and Kitchen Improvements
Renovation
Results
Lafayette, IN 47905

Main and Second Floor Modifications Phase III
Renovation
Results
$2,500,000 est. value
West Lafayette, IN 47906

Wellness Clinic
Renovation
Results
Lafayette, IN 47909

Interior Renovations
Renovation
Results
$525,000 est. value
Lafayette, IN 47909

Jefferson High School Cafeteria and Kitchen Improvements
New Construction
Results
Lafayette, IN 47909

Reported 04/23/2022 12:00 AM
Project Title

Construction Manager As Constructor - Klondike Elementary

Physical Address View project details and contacts
City, State (County) Lafayette, IN   (Tippecanoe County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $54,000,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope of work consist of additions and renovations to Klondike Elementary School and additions and renovations to Klondike Intermediate School plus site improvements to their shared site. Klondike Intermediate School will be a new school for the Owner and will eventually occupy the existing building currently operating as Klondike Middle School. Klondike Middle School will move to a new adjacent facility All is described in more detail in the Request for Proposals for Construction Manager as Constructor Contract, dated as of March 31, 2022 (the “RFP”), to submit a Verified Statement of Proposal to provide Construction Manager as Constructor Services for the Project. The estimated Cost of the Work is approximately $54,000,000 combined for the two facilities making up the Project.

Details

Elementary School, New Construction, Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents